EPNG Maintenance Calendar
August 2026
Seg Area
Seg Nbr
Flow Dir
Location
Base Capacity (MDth)
Sat 1
Sun 2
Mon 3
Tue 4
Wed 5
Thu 6
Fri 7
Sat 8
Sun 9
Mon 10
Tue 11
Wed 12
Thu 13
Fri 14
Sat 15
Sun 16
Mon 17
Tue 18
Wed 19
Thu 20
Fri 21
Sat 22
Sun 23
Mon 24
Tue 25
Wed 26
Thu 27
Fri 28
Sat 29
Sun 30
Mon 31
Anadarko
690
F
PLAIN ST
756
405
% Seg Avail
46%
740
B
AMAR N
292
42
86%
AMAR S
309
49
84%
760
DUMAS S
310
72
100%
77%
780
DUMAS E
170
63
63%
Lincoln Crossover
640
CAPROCK N
608
66
173
89%
72%
645
LUSK
284
22
92%
Maricopa
540
N PHX1
121
20
83%
North Mainline
200
NORTH ML
2223
629
Permian Virtual Segment
940
CORNU E
797
101
87%
GUADLUP
1154
108
KEYST ST
781
229
KEYSTAFL
749
196
L2000
606
140
PECOS
1162
111
PUC WAHA
130
WA2CORN
721
WAHACORN
794
100
314598 (IWARMONU)
85
0%
48164 (IRAMSEYN)
547
205
South Mainline
1600
CORN HPW
574
47
76
CORN LPW
1166
55
CORNL2K
572
CORNTRN
135
2447
94%
91%
1690
FLOR B
594
FLOR C
567
FLORIDA
978
2139
93%
1760
LORDS B
569
45
75
LORDS C
565
LORDSBRG
962
204
452
2096
81%
80%
1800
BOWIE
CIMARRON
563
DRAGOON
715
1845
90%
88%
1920
ORACLE
588
TOM MIX
560
VAIL
876
2024
99%
2020
CASA C
CASAG LP
504
43
CG HP
586
1698
97%
Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Total Reduction Dthd
PLM Reduction Dthd
FMJ Reduction Dthd
Net Dthd
Update
08/01/26
08/17/26
NM
Williams C Station maintenance
2,223,400
629,180
-
1,594,220
08/18/26
08/20/26
Williams C Station maintenance Window Rock 1A inspection
08/21/26
08/31/26
PHX
Line 1203 smart tool San Juan Line to North Phoenix
121,800
20,900
100,900
08/24/26
XO
Caprock 2A equipment failure repair - FMJ Reduction
608,500
66,196
542,304
08/25/26
08/28/26
Caprock 2A equipment failure repair - FMJ Reduction Roswell Station DOT/ESD Tests
173,044
106,848
435,456
08/29/26
284,900
22,350
262,550
AN
Amarillo 2A equipment failure repair - FMJ Reduction
292,400
42,400
250,000
309,500
49,500
260,000
Dumas Station DOT/ESD Tests
310,500
72,831
237,669
170,000
63,288
106,712
PR
Plains 7A repair Plains 8A repair Plains 11A repair Plains 13A repair Plains 14A repair Plains 15A repair Plains Station equipment failure repair - FMJ Reduction
756,100
405,923
350,177
314598
Monument A Station equipment failure repair - Warren Monument Receipt (IWARMONU) - Customer to zero Dth/d during Monument A Station mechanical failure repair - FMJ Reduction
85,739
Keystone 4A repair Keystone 11A repair Keystone 1B repair Keystone 2B repair
781,000
229,021
551,979
749,000
196,991
552,009
Puckett Station equipment failure repair - FMJ Reduction
130,000
Line 1100 cleaning and smart tools Pecos River to Guadalupe
1,162,100
111,782
1,050,318
08/05/26
48164
Ramsey North Receipt - (IRAMSEYN) - Customer limited to zero Dth/d flow for 9 hours during meter station maintenance
547,900
205,463
342,437
1,154,000
108,056
1,045,944
08/11/26
08/14/26
SM
Cornudas 1A inspection
1,166,600
55,383
1,111,217
Cornudas 3A inspection
08/30/26
San Simon Station equipment failure repair - FMJ Reduction
962,300
204,928
757,372
San Simon Station equipment failure repair - FMJ Reduction Line 1103 pipeline remediation Deming to San Simon
452,951
248,023
509,349
Line 1100 hydrotest Tucson to Casa Grande
504,100
43,509
460,591
08/04/26
Line 1600 pipeline maintenance Waha to Gresham
797,900
101,093
696,807
Gresham Station DOT/ESD Tests
721,900
66,735
655,165
794,746
100,173
694,573
Florida 1C equipment failure repair - FMJ Reduction
606,600
140,000
466,600
Florida 1C equipment failure repair - FMJ Reduction Cornudas 1C and 2C maintenance (One Unit at a Time)
08/07/26
Florida 1C equipment failure repair - FMJ Reduction Tom Mix 1A maintenance
572,300
432,300
08/08/26
08/16/26
Florida 1C equipment failure repair - FMJ Reduction Tom Mix 2A maintenance
Florida 1C equipment failure repair - FMJ Reduction Cornudas 1C and 2C maintenance (One Unit at a Time) Tom Mix 2A maintenance
567,700
427,700
565,500
425,500
563,400
423,400
Tom Mix 1A maintenance
560,400
20,060
540,340
Tom Mix 2A maintenance
Lordsburg 1B maintenance
574,900
47,641
527,259
Lordsburg 1B maintenance Gresham Station DOT/ESD Tests
76,968
497,932
569,600
45,156
524,444
75,298
494,302
45,181
522,519
75,259
492,441
In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.
Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.
These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.
More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the EPNG Electronic Bulletin Board.