EPNG Maintenance Calendar
December 2025
Seg Area
Seg Nbr
Flow Dir
Location
Base Capacity (MDth)
Mon 1
Tue 2
Wed 3
Thu 4
Fri 5
Sat 6
Sun 7
Mon 8
Tue 9
Wed 10
Thu 11
Fri 12
Sat 13
Sun 14
Mon 15
Tue 16
Wed 17
Thu 18
Fri 19
Sat 20
Sun 21
Mon 22
Tue 23
Wed 24
Thu 25
Fri 26
Sat 27
Sun 28
Mon 29
Tue 30
Wed 31
Anadarko
690
F
PLAIN ST
756
293
% Seg Avail
61%
715
B
PLAINS N
328
69
100%
79%
740
AMAR N
282
51
82%
AMAR S
310
63
80%
Havasu
400
DUTCH F
649
0%
Lincoln Crossover
640
CAPROCK N
625
74
88%
Line 1903
3000
MOJTHRU
463
117
75%
Mojave Seamless
3040
MOJAVE
54
87%
North Mainline
200
NORTH ML
2286
131
905
246
199
232
283
94%
60%
89%
91%
90%
Permian Virtual Segment
940
GUADLUP
1211
292
KEYST ST
781
158
KEYSTAFL
754
PECOS
1296
377
WA2CORN
771
96
485
433
South Mainline
1600
CORN HPW
621
72
467
416
76
CORN LPW
1204
92
CORNL2K
609
27
CORNTRN
143
2577
77%
1760
LORDS B
616
70
464
414
LORDS C
602
44
LORDSBRG
1026
202
2244
86%
97%
1800
BOWIE
613
68
462
412
CIMARRON
599
26
DRAGOON
717
1929
96%
95%
76%
1885
WILCLAT
311
128
59%
1920
ORACLE
611
TOM MIX
596
25
VAIL
680
1887
99%
2080
HAVASU E
741
2160
WENDEN
2239
WENDWST
1590
760
3829
Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Total Reduction Dthd
PLM Reduction Dthd
FMJ Reduction Dthd
Net Dthd
Update
12/01/25
NM
Flagstaff 2A equipment failure repair - FMJ Reduction
2,286,609
131,467
-
2,155,142
12/02/25
12/04/25
Flagstaff 2A equipment failure repair - FMJ Reduction Navajo 2C inspection Williams 1C inspection Window Rock 6B inspection
905,798
774,331
1,380,811
12/05/25
12/08/25
12/09/25
12/11/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 4B inspection Window Rock 4B inspection
246,154
114,687
2,040,455
12/12/25
12/15/25
12/16/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 8A inspection
199,409
67,942
2,087,200
12/17/25
Flagstaff 2A equipment failure repair - FMJ Reduction Window Rock B Station maintenance Leupp 8A inspection
232,181
100,714
2,054,428
12/18/25
Flagstaff 2A equipment failure repair - FMJ Reduction Window Rock A Station maintenance Leupp 8A inspection
283,053
151,586
2,003,556
12/19/25
12/31/25
MOJ
Mojave 3A maintenance
463,000
117,000
346,000
400,000
54,000
HX
Alamo Lake Station maintenance Wenden Station Valve 9110 maintenance
649,300
741,800
XO
Laguna Station Station equipment failure repair - FMJ Reduction Caprock 2A equipment failure repair - FMJ Reduction
625,200
74,630
550,570
AN
Amarillo 1A equipment failure repair - FMJ Reduction Amarillo 2A equipment failure repair - FMJ Reduction Dimmitt 2A maintenance
282,600
51,404
231,196
310,800
63,568
247,232
12/06/25
PR
Line 1102 cleaning/smart tools Plains to Dimmitt
328,700
69,112
259,588
Plains 3A repair Plains 8A repair Plains 14A repair Plains 15A repair
756,100
293,371
462,729
Keystone 4A repair Keystone 11A repair Keystone 2B repair
781,000
158,147
622,853
754,500
131,586
622,914
Gresham Station mechanical failure repair - FMJ Reduction
771,600
96,778
674,822
Gresham Station mechanical failure repair - FMJ Reduction Line 1600 smart tool Lordsburg B to Bowie
485,176
388,398
286,424
Gresham Station mechanical failure repair - FMJ Reduction Line 1600 smart tool Gresham to Cornudas
433,794
337,016
337,806
Guadalupe Station maintenance
1,296,000
377,477
918,523
1,211,000
292,477
SM
Hueco 3A equipment failure repair - FMJ Reduction Cornudas 1A equipment failure repair - FMJ Reduction
1,204,400
92,919
1,111,481
Lordsburg 2A maintenance
1,026,000
202,504
823,496
Willcox 1A inspection
311,779
128,409
183,370
Wenden Station Valve 9110 maintenance
1,590,200
760,789
829,411
Tom Mix 1A inspection
609,100
27,696
581,404
602,200
44,821
557,379
599,900
26,586
573,314
596,700
25,051
571,649
143,300
46,522
Bowie Station maintenance
621,700
72,238
549,462
Bowie Station maintenance Line 1600 smart tool Lordsburg B to Bowie
467,383
154,317
Bowie Station maintenance Line 1600 smart tool Gresham to Cornudas
416,893
204,807
76,571
545,129
616,000
70,871
464,650
151,350
414,200
201,800
613,900
68,771
462,550
412,100
In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.
Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.
These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.
More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the EPNG Electronic Bulletin Board.