EPNG Maintenance Calendar
August 2025
Seg Area
Seg Nbr
Flow Dir
Location
Base Capacity (MDth)
Fri 1
Sat 2
Sun 3
Mon 4
Tue 5
Wed 6
Thu 7
Fri 8
Sat 9
Sun 10
Mon 11
Tue 12
Wed 13
Thu 14
Fri 15
Sat 16
Sun 17
Mon 18
Tue 19
Wed 20
Thu 21
Fri 22
Sat 23
Sun 24
Mon 25
Tue 26
Wed 27
Thu 28
Fri 29
Sat 30
Sun 31
Anadarko
690
F
PLAIN ST
756
261
% Seg Avail
65%
740
B
AMAR N
293
53
82%
AMAR S
310
70
77%
760
305421 (INNDUMAS)
331
0
100%
0%
780
DUMAS E
170
100
69%
41%
DUMAS S
311
45
32
86%
90%
Lincoln Crossover
640
CAPROCK N
608
86
104
336
137
83%
45%
Line 1903
3020
CADIZSOU
509
84
Maricopa
540
N PHX1
121
41
66%
North Mainline
200
NORTH ML
2223
615
451
247
72%
80%
89%
Permian Virtual Segment
940
BENSWPK
128
74
GUADLUP
1154
159
KEYST ST
781
160
KEYSTAFL
749
WA2CORN
721
82
377034 (ITEXNEUN)
76
San Juan
110
BONDADST
726
136
81%
South Mainline
1600
CORN HPW
576
237
CORN LPW
1170
271
CORNL2K
574
CORNTRN
153
2473
79%
1640
EL PASO
1235
21
ELPASO C
579
ELPASO E
2390
99%
1677
300842 (DEPECAFT)
73
1740
HP 3
583
L2K-3
REDMTN
887
2049
94%
1760
LORDS B
571
411
LORDS C
567
LORDSBRG
965
68
2103
97%
1800
BOWIE
569
409
CIMARRON
565
DRAGOON
710
1844
78%
(blank)
Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Total Reduction Dthd
PLM Reduction Dthd
FMJ Reduction Dthd
Net Dthd
Update
08/19/25
SJ
Bondad 1B inspection
726,500
136,789
589,711
08/01/25
08/04/25
NM
Flagstaff 2A equipment failure repair - FMJ Reduction Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Revised Capacity Impact Dth/d
2,223,400
615,666
492,458
123,208
1,607,734
08/05/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 8A inspection Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service. Line 1208 pipeline remediation Leupp to Flagstaff
451,464
328,256
1,771,936
08/06/25
08/07/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 8A inspection Leupp 1D Station maintenance Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service. Line 1208 pipeline remediation Leupp to Flagstaff
08/08/25
Flagstaff 2A equipment failure repair - FMJ Reduction Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service. Line 1208 pipeline remediation Leupp to Flagstaff
08/09/25
08/15/25
Flagstaff 2A equipment failure repair - FMJ Reduction Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service. Line 1208 pipeline remediation Leupp to Flagstaff - Completed
247,823
124,615
1,975,577
Update Cycle 1
08/16/25
08/18/25
Flagstaff 2A equipment failure repair - FMJ Reduction Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service.
08/22/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 3C inspection Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service.
08/23/25
08/25/25
08/26/25
08/27/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 2B inspection Williams 3B inspection Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service.
08/28/25
Flagstaff 2A equipment failure repair - FMJ Reduction Leupp 2B inspection Dilkon 1A repair Line 1204 Leupp to Seligman isolated for test running of Flagstaff Station - Returned to normal operating service.
08/29/25
08/31/25
PHX
Line 1203 cleaning tool North Phoenix to Chandler
121,800
41,080
80,720
Line 1203 smart tool North Phoenix to Chandler
08/30/25
MOJ
Cadiz Meter Station maintenance
509,500
84,500
425,000
08/11/25
XO
Line 1301 pipeline maintenance Bluewater to Valve City Laguna Station equipment failure repair - FMJ Reduction
608,500
86,987
11,201
75,786
521,513
08/12/25
Line 1301 pipeline maintenance Bluewater to Valve City Laguna Station equipment failure repair - FMJ Reduction Line 1301 cleaning tool Lincoln to Belen
104,121
28,335
504,379
08/13/25
Line 1301 pipeline maintenance Bluewater to Valve City Laguna Station equipment failure repair - FMJ Reduction Line 1301 smart tool Lincoln to Belen
08/14/25
Line 1301 pipeline maintenance Bluewater to Valve City Line 1301 smart tool Lincoln to Belen - Rescheduled Laguna Station equipment failure repair - FMJ Reduction
08/17/25
08/21/25
Line 1301 pipeline maintenance Bluewater to Valve City Laguna Station DOT/ESD Tests - Rescheduled Bluewater Station DOT/ESD Tests Laguna Station equipment failure repair - FMJ Reduction
336,433
260,647
272,067
Line 1301 pipeline maintenance Bluewater to Valve City Laguna Station equipment failure repair - FMJ Reduction Roswell Station maintenance
137,972
62,186
470,528
AN
Amarillo 1A equipment failure repair - FMJ Reduction Dimmitt 2A maintenance
293,300
53,300
1,600
51,700
240,000
310,400
70,400
3,970
66,430
305421
Northern Natural Gas Company - Sunray Dumas Delivery - (INNDUMAS) - Customer to zero Dth /d during meter station maintenance
331,122
-
Northern Natural Gas Company - Sunray Dumas Delivery - (INNDUMAS) - Customer to zero Dth /d during meter station maintenance - Reduced Project Schedule Duration
Dumas Station maintenance
311,400
45,954
265,446
08/02/25
Dumas Station maintenance - Revised Capacity Impact Dth/d
32,370
279,030
170,500
53,264
117,236
100,150
70,350
PR
Plains 7A repair Plains 8A repair Plains 12A repair Plains 14A repair Plains 15A repair
756,100
261,100
495,000
377034
Eunice C Station Unit #3 mechanical failure repair - Texaco Eunice Receipt (ITEXNEUN) - Customer to zero Dth/d during Eunice C Station Unit #3 mechanical failure repair - FMJ Reduction - Extended
76,545
Eunice C Station Unit #3 mechanical failure repair - Texaco Eunice Receipt (ITEXNEUN) - Customer to zero Dth/d during Eunice C Station Unit #3 mechanical failure repair - Completed
Keystone 11A repair Keystone 12A repair Keystone 2B repair
781,000
160,198
620,802
749,000
128,137
620,863
Line 3137 cleaning tool Benedum to Sweetie Peck Junction
128,000
74,706
53,294
Line 3137 smart tool Benedum to Sweetie Peck Junction
Line 3137 smart tool Benedum to Sweetie Peck Junction - Rescheduled
Guadalupe Station inspection
1,154,000
159,004
994,996
SM
Hueco 1A maintenance Hueco 3A equipment failure repair - FMJ Reduction Cornudas 1A and 3A equipment failure repair - FMJ Reduction Line 1100 pipeline remediation Cornudas to Hueco
1,170,100
271,637
88,841
182,796
898,463
Cornudas 3A inspection Hueco 1A maintenance Hueco 3A equipment failure repair - FMJ Reduction Cornudas 1A and 3A equipment failure repair - FMJ Reduction Line 1100 pipeline remediation Cornudas to Hueco
El Paso 1D inspection
1,235,100
21,239
1,213,861
300842
Line 2058 cleaning/smart tools South Union Central Line - Rio Grande Power Plant (DEPECAFT) - Customer assistance requested for tool runs (10 Mmcf/d flow required for tool runs) - No capacity impact - Informational only
73,990
Line 2058 smart tool South Union Central Line - Rio Grande Power Plant (DEPECAFT) - Customer assistance requested for tool runs (10 Mmcf/d flow required for tool run) - No capacity impact - Informational only
Red Mountain Station inspection
887,700
128,505
759,195
San Simon 2A maintenance
965,200
68,050
897,150
Gresham Station DOT/ESD Tests
721,900
82,256
639,644
Line 1600 cleaning/smart tools Lordsburg B to Bowie - Rescheduled
576,600
Line 1600 cleaning/smart tools Lordsburg B to Bowie
237,312
339,288
571,300
411,720
159,580
569,400
409,820
In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.
Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.
These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.
More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the EPNG Electronic Bulletin Board.