STRAINED OPERATING CONDITION (SOC) Declaration - System Wide PACK
EFFECTIVE DATE: March 21, 2024
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: System-wide
OPERATING CONDITION SUMMARY: The EPNG system continues to experience a high linepack condition with system linepack currently above 8,350 MMcf.
Deliveries below scheduled quantities.
Receipts in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to insure that system integrity is maintained.
EPNG RESPONSE:
- Washington Ranch is on injection with one of the two units unavailable.
- Supply operators have been or will be contacted and per Section 11.2(a)(ii) of the tariff, notified that EPNG will invoke flow control if they do not reduce their deliveries into the EPNG system to match their scheduled quantities.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.