Location
Base Capacity (MDth)
Mon 1
Tue 2
Wed 3
Thu 4
Fri 5
Sat 6
Sun 7
Mon 8
Tue 9
Wed 10
Thu 11
Fri 12
Sat 13
Sun 14
Mon 15
Tue 16
Wed 17
Thu 18
Fri 19
Sat 20
Sun 21
Mon 22
Tue 23
Wed 24
Thu 25
Fri 26
Sat 27
Sun 28
Mon 29
Tue 30
Wed 31
AFTON
1088
82
AMAR N
311
26
AMAR S
310
10
BONDADST
742
437
147
BOWIE
603
CAPROCK N
621
100
269
CORN HPW
611
0
67
CORN LPW
1176
77
CORNL2K
601
101
CRANESOU
114
DRAGOON
579
71
DUTCH F
638
148
21
84
FLORIDA
1007
53
JAL
309
KEYST ST
714
36
L2000
612
97
105
106
LORDS C
594
90
98
LORDSBRG
1006
273
292
61
MOJAVE
400
54
MOJTHRU
463
117
NORTH ML
2327
168
178
424
313
231
351
306
PLAIN ST
756
91
PUC WAHA
134
REDMTN
948
171
506
RIO VISTA
152
28
STERLING
45
WAHA GE
600
164
WILCLAT
312
205
128
DSTERLNG (53626)
DEPECAFT (300842)
74
DSRP PHX (301043)
518
ICONSTER (314447)
42
DSCALTOP (332503)
550
220
DPHILMID (341922)
4
ITEXNEUN (377034)
ISUNJAME (377078)
60
IDEADWD (800913)
Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Reduction Dthd
Net Dthd
Update
03/01/21
NM
Leupp 1B repair Williams 3B repair
2,327,251
167,575
2,159,676
03/02/21
03/08/21
Leupp 1B repair Line - 1104 pipeline remediation Hackberry to MLV 13 Williams 3B repair
177,839
2,149,412
03/09/21
03/10/21
Leupp 2A inspection Hackberry Station DOT/ESD Test Line 1104 pipeline remediation Hackberry to MLV 13 Leupp 3B inspection Line 1201 pipeline remediation Dilkon to Leupp Leupp 1B repair Williams 3B repair
423,504
1,903,747
03/11/21
Leupp 3B inspection Hackberry Station DOT/ESD Test Line 1104 pipeline remediation Hackberry to MLV 13 Line 1201 pipeline remediation Dilkon to Leupp Leupp 1B repair Williams 3B repair
03/12/21
Line 1201 pipeline remediation Dilkon to Leupp Line 1104 pipeline remediation Hackberry to MLV 13 Leupp 1B repair Williams 3B repair
313,304
2,013,947
03/13/21
03/14/21
Line 1104 pipeline remediation Hackberry to MLV 13 Leupp 1B repair Williams 3B repair
03/15/21
Hackberry 2 inspection Line 1104 pipeline remediation Hackberry to MLV 13 Leupp 1B repair Williams 3B repair
230,900
2,096,351
03/16/21
03/19/21
Line 1201 pipeline remediation Dilkon to Leupp Hackberry 2 inspection Line 1104 pipeline remediation Hackberry to MLV 13 Window Rock 5B inspection Leupp 1B repair Williams 3B repair
351,447
1,975,804
03/20/21
03/22/21
03/23/21
03/24/21
Dilkon Station "A" & "B" DOT/ESD Test Leupp 5A inspection Leupp 1B repair Williams 3B repair
305,558
2,021,693
03/25/21
Leupp 5A inspection Leupp 1B repair Williams 3B repair Leupp 1B repair Williams 3B repair
177,928
2,149,323
03/26/21
03/31/21
SJ
Rio Vista Station DOT/ESD Test
151,600
-
Rio Vista 2A shut down checks
28,128
123,472
03/30/21
Bondad Station "A" DOT/ESD Test no flow for 12 hrs Bondad Station "B" DOT/ESD Test
741,900
436,600
305,300
Bondad "B" Station maintenance
147,283
594,617
HX
Alamo Lake Station DOT/ESD Test
638,000
148,191
489,809
Alamo Lake 1A shut down checks
21,309
616,691
Alamo Lake 2A shut down checks
83,849
554,151
Dutch 1A inspection
67,414
570,586
PHX
301043
Line 2055 hydro test MLV 0 to MLV 1 Kyrene Power Plant will be provided alternate service Line 2172 during this test Informational only
518,204
03/17/21
XO
Lincoln 1A repair - Force Majeure Reduction- 99,576 Dthd
621,000
99,576
521,424
03/18/21
Belen Station maintenance Lincoln 1A repair - Force Majeure Reduction- 99,576 Dthd
268,667
352,333
AN
Plains 14A repair Plains 5A repair Plains 12A repair Plains 9A repair Plains 7A repair
756,100
90,820
665,280
Line 1102 pipeline remediation Amarillo to Dumas
311,315
25,569
285,746
309,827
10,145
299,682
PR
WAHA Solar Units 1,2,3 ,4 repair
600,000
164,000
436,000
133,600
113,700
Keystone 9A repair Keystone 3B repair completed Keystone "A" Station repair completed
714,399
36,200
678,199
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4
45,230
53626
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4 location shut in - GCX - Sterling Delivery (DSTERLING)
45,300
800913
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4 location shut in - Deadwood Receipt (IDEADWD)
77,000
314447
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4 location shut in - Conoco Sterling Receipt (ICONSTER)
41,870
341922
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4 location shut in - Credo Fuel Booster (DPHILMID)
4,190
377078
L3132 pipeline maintenance shut in required MLV 1 1/2 to MLV 1 3/4 location shut in - Jameson Plant (ISUNJAME)
60,080
377034
Eunice 3C mechanical Inspection no flow at ITEXNEUN (377034) during this maintenance only. Alternate scheduling location IWAREUNI
76,545
Eunice Station B DOT/ESD Test rescheduled
308,600
SM
Lordsburg 1C shut down checks
611,700
96,521
515,179
593,900
89,680
504,220
03/03/21
Black River Station DOT/ESD Test Lordsburg 1C shut down checks
104,873
506,827
03/04/21
Black River Station DOT/ESD Test Lordsburg 1C shut down checks schedule revised
Lordsburg 1C shut down checks Black River Station DOT/ESD Test
98,491
495,409
Lordsburg 1C shut down checks schedule revised Black River Station DOT/ESD Test no impact
03/05/21
Black River Station DOT/ESD Test
Cornudas Station "C" DOT/ESD Test
105,611
506,089
600,800
101,195
499,605
Cornudas 2A repair
1,175,700
77,253
1,098,447
Cornudas 1B maintenance rescheduled
610,900
Cornudas 1B maintenance
67,442
543,458
Florida 2A maintenance
1,087,983
81,622
1,006,361
1,007,300
52,996
954,304
San Simon 3A maintenance Line 1100 pipeline remediation San Simon to Dragoon
1,006,000
272,688
733,312
Line 1100 pipeline remediation San Simon to Dragoon Lordsburg Station "A" DOT/ESD Test San Simon 3A maintenance
291,820
714,180
Line 1100 pipeline remediation San Simon to Dragoon San Simon 3A maintenance
03/29/21
San Simon 3A maintenance
60,940
945,060
San Simon 1 inspection
Oracle Station Maintenance
603,300
Line 1100 pipeline remediation San Simon to Dragoon
578,900
70,821
508,079
300842
Line 2034 Hydro test MLV 2 to MLV 3 during this hydro Rio Grande Power Plant will be limited to 35,000 Dthd informational only
73,990
948,500
171,234
777,266
Line 1100 smart pig Deming to San Simon
506,120
442,380
03/27/21
Willcox Station Annual DOT/ESD Test
311,779
205,279
106,500
Willcox 2A shut down checks
128,379
183,400
MOJ
Mojave unit maintenance
400,000
54,000
346,000
463,000
117,000
332503
Line 1112 smart pig Topock to EOL TOPOCK SoCal Delivery limited flow
550,260
220,260
330,000