-Primary impact restrictions may be necessary
TGP - Outage Impact Report
-Major impact restrictions may be necessary
Seven Day Forecast (updated 07/09/26)
-Minor impact restrictions may be necessary depending on flow conditions
-Little to no impact, though minor outages may cause incremental reductions
Station / Seg
Est Nominal
Operating Capacity (Thousand Dth)
Monday
(7/13)
Tuesday
(7/14)
Wednesday
(7/15)
Thursday
(7/16)
Friday
(7/17)
Saturday
(7/18)
Sunday
(7/19)
Primary Outage(s) that may Impact Throughput
Est. Operational Capacity (Operational Impact) - Thousand Dth
Station 409 (Donna Line) (segment 490 FH)
564
Station 1
(segment 101 BH)
399
Station 9
(segment 109 BH)
1,027
945
(82)
1015
(12)
890
(137)
MLV 11-1A to MLV 11-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 12-1 to MLV 11-1A: PHMSA Immediate (7/15/2026 - 7/27/2026)
MLV 13-1 to MLV 12-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 4-1 to MLV 5-1: Emergent Repair (6/9/2026 - 7/13/2026)
MLV 9-1D to MLV 10-1: Anomaly Remediation (7/9/2026 - 7/14/2026)
Station 17
(segment 117 FH)
1,122
1000
(122)
MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
Station 25
(segment 125 FH)
1,078
1035
(43)
MLV 25-2 to MLV 26-2: Pipe Replacement (7/11/2026 - 7/29/2026) MLV 26-2 Relocation: Highway 59 Widening (7/13/2026 - 7/29/2026)
Station 47
(segment 143 FH)
1,343
1330
(13)
1240
(103)
MLV 40-1D to MLV 47-1S: Pig Run - Maintenance (7/14/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/11/2026 - 7/31/2026)
Station 63
(segment 163 FH)
1,242
1117
(125)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)
Station 823
(segment 823 BH)
734
Station 534 South of Pool (segment 530 BH)
1,550
985
(565)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)
MLV 548
(segment 542 BH)
1,647
1565
1600
(47)
MLV 539-2 to MLV 540-2: Anomaly Remediation (7/16/2026 - 7/18/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026)
Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026) Sta 546: Unit 6A - Turbo Replacment (7/8/2026 - 7/17/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 7/31/2026)
Station 860
(segment 548 BH)
1,405
(165)
1195
(210)
1245
(160)
1272
(133)
MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (7/16/2026)
MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (7/14/2026) MLV 559-2A to MLV 560-2: PHMSA Immediate (7/6/2026 - 7/14/2026)
Sta 555: Unit 1B - Hot Gas Path (7/13/2026 - 8/14/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 7/17/2026)
Station 860 North (Segment 860 BH)
1,874
1846
(28)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)
Station 110
(segment 187 BH)
(south thru Kentucky)
2,685
1963
(722)
2150
(535)
MLV 107-7 to 110-7: Valve Installation & Crossover Work (7/7/2026 - 7/27/2026)
MLV 109-7 to MLV 110-7: Pipe Replacement (7/7/2026 - 7/27/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 106: C Building - Install Water Trech System (7/13/2026 - 7/17/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026) Sta 871: Unit 3A - Engine Maintenance (7/13/2026 - 7/31/2026) Sta 96 Campbellsville: Annual ESD Test (7/14/2026 - 7/15/2026)
Sta 96 Campbellsville: Annual Substation Inspection (7/13/2026 - 7/16/2026)
Station 114
(segment 114 BH)
907
726
(181)
MLV 113-2 to MLV 114-2: Emergent Repair (7/7/2026 - 9/27/2026)
Station 204
(Segment 204 BH)
1,828
Station 230C (segment 296 FH)
743
370
(373)
475
(268)
Sta 230C: Annual ESD (M) (7/13/2026 - 7/14/2026)
MLV 230B-205 to MLV 230B-206A: Pig Run - Gauge/Cleaning (7/15/2026) MLV 230B-205 to MLV 230B-206A: Pig Run - Cal/IMU/MFL-A Combo (7/16/2026)
Station 245
(segment 245 FH)
986
970
(16)
760
(226)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026) Sta 245-1 to MLV 249-1: Pig Run - Cal/IMU (7/15/2026)
Sta 245-1 to MLV 249-1: Pig Run - Gauge/Cleaning tool (7/14/2026) Sta 245-1 to MLV 249-1: Pig Run - MFL-C (7/16/2026)
MLV 256 West
(segment 249 FH)
1,203
1045
(158)
MLV 253-1 to MLV 253-1R: Anomaly Remediation (7/12/2026 - 7/17/2026)
Station 261 Discharge East (segment 261 FH)
888
Station 307
(segment 307 BH)
1,153
Station 315
(segment 315 BH)
1,823
MLV 324
(segment 324 FH)
1,767
Station 405 HC Line (segment 299 FH)
794
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.
Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.
July 2026 (updated 07/09/26)
Station # / Lateral
Est Nominal Operating Capacity (Thousand Dth)
Week 1
(6/29 - 7/5)
Week 2
(7/6 - 7/12)
Week 3
(7/13 - 7/19)
Week 4
(7/20 - 7/26)
Week 5
(7/27 - 8/2)
Primary Outage(s)
885
(142)
MLV 13-1 to MLV 12-1: Anomaly Remediation (7/15/2026 - 7/27/2026) MLV 16-1 to MLV 15-1: PHMSA Immediate (7/28/2026 - 8/3/2026) MLV 16-1R to MLV 16-1: PHMSA Immediate (7/28/2026 - 8/3/2026)
MLV 17-3DL to MLV 18-3A: Anomaly Remediation (7/27/2026 - 8/2/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
955
(123)
MLV 25-2 to MLV 26-2: Pipe Replacement (7/11/2026 - 7/29/2026) MLV 26-2 Relocation: Highway 59 Widening (7/13/2026 - 7/29/2026) Sta 25: Annual ESD Test (7/21/2026)
MLV 55-1 to MLV 56-1: PHMSA Immediate (5/11/2026 - 7/31/2026)
Station 834
(segment 834 BH)
683
600
(83)
Sta 834: Station Outage (7/29/2026 - 7/31/2026)
MLV 533-2 to MLV 534-2: Pipe Replacement (M) (6/4/2026 - 9/4/2026) Sta 529: Unit 1A - Engine Inspection (7/21/2026)
Sta 530: Unit 1A - Bearings (8/25/2025 - 12/31/2026)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026) Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 7/31/2026)
1,593
1460
Sta 555: Unit 1B - Hot Gas Path (7/13/2026 - 8/14/2026)
MLV 101-1 to MLV 102-1: Anomaly Remediation (7/20/2026 - 7/25/2026) MLV 102-1 to MLV 103-1: Anomaly Remediation (7/26/2026 - 7/30/2026) MLV 107-7 to 110-7: Valve Installation & Crossover Work (7/7/2026 - 7/27/2026)
MLV 109-4 to 110-4: Valve Installation & Crossover Work (7/28/2026 - 8/11/2026)
MLV 109-4 to MLV 110-4: Pipe Replacement (7/28/2026 - 8/11/2026) MLV 109-7 to MLV 110-7: Pipe Replacement (7/7/2026 - 7/27/2026)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (7/27/2026 - 8/31/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026)
Sta 871: Unit 3A - Engine Maintenance (7/13/2026 - 7/31/2026)
Station 237
(segment 237 FH)
1,006
780
MLV 237-1 to MLV 245-1: Pig Run - Cleaning/Gauge (7/27/2026) MLV 237-1 to MLV 245-1: Pig Run - MFL-C (7/29/2026)
Sta 245: Unit 1A & 2A - Exhaust System & HP Fuel (4/27/2026 - 11/1/2026)
535
(668)
MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (7/20/2026) MLV 249-2 to MLV 254-2: Hardspot/Geo (7/23/2026)
MLV 249-2 to MLV 254-2: MFL-A/IMU (7/21/2026)
1110
1115
(38)
Sta 219: Unit 1B - Protective Device Checks & GHG (7/20/2026 - 7/24/2026) Sta 219: Unit 1B - Save Air System (7/20/2026 - 7/31/2026)
Sta 307: Unit 1A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 2A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 3A - Protective Device Checks (7/20/2026 - 7/24/2026) Sta 307: Unit 4A - Protective Device Checks (7/20/2026 - 7/24/2026)
Station 313 Discharge (segment 399 FH)
797
720
(77)
Sta 313: Unit 1C - Substation Inspection (7/30/2026 - 7/31/2026)
Station 321
(segment 321 FH)
2,102
1715
(387)
Sta 321: Station Valves for ESD System (7/21/2026 - 7/23/2026)
1450
(317)
Sta 325: Station Outage (7/28/2026 - 7/30/2026)
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.
August 2026 (updated 07/09/26)
Est Nominal Operating Capacity
(Thousand Dth)
(8/3 - 8/9)
(8/10 - 8/16)
(8/17 - 8/23)
(8/24 - 8/30)
640
MLV 16-1 to MLV 15-1: PHMSA Immediate (7/28/2026 - 8/3/2026) MLV 16-1R to MLV 16-1: PHMSA Immediate (7/28/2026 - 8/3/2026)
MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/13/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/14/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/15/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/16/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/17/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/18/2026) MLV 5-2 to MLV 1-2D: Pig Run - Cleaning Gauge (M) (8/19/2026) MLV 5-2 to MLV 1-2D: Pig Run - TDW MDS (M) (8/20/2026)
1100
(22)
MLV 19-1 TO MLV 20-1A: Pipe Replacement (M) (8/6/2026 - 9/15/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (7/6/2026 - 8/3/2026)
925
(153)
MLV 26-3 Relocation: Highway 59 Widening (M) (8/3/2026 - 8/20/2026)
1105
(238)
MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (8/11/2026) MLV 40-4D to MLV 47-4S: Pig Run - Maintenance (8/13/2026)
901
(341)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 77-3 to MLV 77-3A: Pipe Replacements (8/3/2026 - 8/13/2026) MLV 82-2C to MLV 83-2: Anomaly Remediation (8/3/2026 - 8/7/2026)
1635
(407)
Sta 542 Dekalb: Annual ESD Test (8/25/2026 - 8/27/2026) Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026)
2281
(404)
2070
(615)
1882
(803)
MLV 104-1 to MLV 105-1: Anomaly Remediation (8/6/2026 - 9/6/2026)
MLV 109-4 to MLV 110-4: Pipe Replacement (7/28/2026 - 8/11/2026) MLV 109-5 to MLV 109-5A: Pipe Replacement (8/18/2026 - 9/1/2026) MLV 109-5A to MLV 110-5: Pipe Replacement (8/18/2026 - 9/1/2026)
MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - Cleaning / Gauge (8/25/2026)
MLV 87-3 to MLV 96-3: Pig Run - EMAT (8/27/2026)
MLV 96-3BR to MLV 96-3BL: Spike Test (7/27/2026 - 8/31/2026)
Sta 106: Unit 1D - 4K Solar Turbine Inspection (8/18/2026 - 8/20/2026) Sta 110: Install ESD Silence Covers (8/24/2026 - 8/28/2026)
Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026) Sta 875: Unit 1A- 8K Solar Turbine Inspection (8/17/2026 - 8/21/2026)
Sta 96: Unit 2D - Install Ball Grove Valve (8/3/2026 - 8/7/2026)
381
(526)
MLV 113-2 to MLV 114-2: Emergent Repair (7/7/2026 - 9/27/2026) MLV 117-3 to MLV 118-3: Special Permit Pipe Replacement (8/10/2026 -
8/30/2026)
MLV 119-2 to MLV 119-2A: Special Permit Pipe Replacement (8/10/2026 - 8/30/2026)
965
(188)
765
(388)
Sta 219: Annual ESD Test & Scrubber Maintenance (8/17/2026 - 8/21/2026) Sta 307 (Pigeon): Annual ESD Test & Maintenance (8/3/2026 - 8/7/2026) Sta 307 (Pigeon): MLV Operators / Air Comp Install / Fuel Skid (8/24/2026 - 8/28/2026)
515
(282)
Sta 313 Coudersport: Annual ESD Test & Maintenance (8/17/2026 - 8/20/2026)
Station 317
(segment 317 BH)
1,548
1345
(203)
Sta 317: Annual ESD Test & Maintenance (8/24/2026 - 8/28/2026)
1700
(67)
MLV 324-1 to MLV 324-1A: Anomaly Remediation (8/24/2026 - 8/29/2026)
Station 224
(segment 224 FH)
388
280
(108)
Station 224: Scrubber Inspections & Filter Change (8/25/2026 - 8/26/2026)
September 2026 (updated 07/09/26)
(8/31 - 9/6)
(9/7 - 9/13)
(9/14 - 9/20)
(9/21 - 9/27)
Station 409A (Alamo) (segment 492 FH)
274
125
(149)
MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/7/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/8/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - Cleaning / Gauge (M) (9/9/2026) MLV 409A-101.1 to MLV 409A-103: Pig Runs - EMAT (M) (9/11/2026)
MLV 409A-101.1 to MLV 409A-103: Pig Runs - MFL-C (M) (9/10/2026)
505
(59)
MLV 409-1 to MLV 406-1: Spike Test (9/1/2026 - 10/31/2026)
300
(99)
MLV 1-1D to MLV 5-1: Spike Test (M) (9/1/2026 - 11/2/2026)
1085
(37)
MLV 17-1D to MLV 20-1A: Pig Run - CLEANING (9/21/2026) MLV 17-1D to MLV 20-1A: Pig Run - EMAT (9/24/2026)
MLV 17-1D to MLV 20-1A: Pig Run - GAUGE PLATE (9/22/2026) MLV 17-1D to MLV 20-1A: Pig Run - MFL-C (9/23/2026)
MLV 19-1 TO MLV 20-1A: Pipe Replacement (M) (8/6/2026 - 9/15/2026)
(298)
MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (9/8/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (9/10/2026)
MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (8/31/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (9/1/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (9/2/2026)
670
Sta 834: Unit 1A - Replace Insulation Blanket (9/14/2026 - 9/15/2026) Sta 834: Unit 2A - Replace Insulation Blanket (9/16/2026 - 9/17/2026) Sta 834: Unit 3A - Replace Insulation Blanket (9/18/2026 - 9/19/2026) Sta 834: Unit 4A - Replace Insulation Blanket (9/21/2026 - 9/22/2026)
Sta 834: Unit 4A - Replace Lubrication System (9/7/2026 - 9/11/2026)
1528
1640
(7)
Sta 542: Unit 2A - Emergent Repair (4/7/2026 - 9/30/2026) Sta 542: Unit 3A - Emergent Repair (3/26/2026 - 8/31/2026)
1580
786
(807)
1430
(163)
MLV 546-2 to MLV 547-2: Line Recoat (9/8/2026 - 9/10/2026)
Sta 546: Annual ESD Tests & Maintenance (9/7/2026 - 9/11/2026)
Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (9/14/2026) Sta 555: Unit 4A - Engine Maintenance (8/31/2026 - 9/5/2026)
1530
(344)
Sta 563: Unit 1A - Annual Inspection & Safety Device Check (9/14/2026 - 9/16/2026)
Sta 563: Unit 2A - Annual Inspection/CAV (9/16/2026 - 9/18/2026)
Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026) Sta 860: Unit 1B - Replace Turbocharger (8/31/2026 - 9/4/2026)
1899
(786)
2534
(151)
MLV 104-1 to MLV 105-1: Anomaly Remediation (8/6/2026 - 9/6/2026) MLV 104-3 to MLV 106-3S: HDD at Kentucky River (9/2/2026 - 9/6/2026) MLV 105-1 to MLV 105-1A: Anomaly Remediation (9/7/2026 - 9/12/2026) MLV 109-3A to MLV 110-3: Pipe Replacement (9/8/2026 - 9/15/2026) MLV 109-5 to MLV 109-5A: Pipe Replacement (8/18/2026 - 9/1/2026) MLV 109-5A to MLV 110-5: Pipe Replacement (8/18/2026 - 9/1/2026)
Sta 106: Unit 2D - 4K Solar Turbine Inspection (9/16/2026 - 9/18/2026) Sta 87: Unit 3D - Power side Overhaul (6/22/2026 - 9/30/2026)
Sta 871 Campbellsville: Annual ESD Test (9/1/2026)
721
(186)
MLV 113-2 to MLV 114-2: Emergent Repair (7/7/2026 - 9/27/2026) Sta 119A: Unit 1A - Solar Turbine Inspection (9/14/2026 - 9/16/2026)
1760
(68)
1375
(453)
MLV 214-3 to MLV 219-3: Pig Run - Cal/IMU/MFL-A Combo (M) (9/10/2026)
MLV 214-3 to MLV 219-3: Pig Run - Gauge/Cleaning (M) (9/8/2026) Sta 204: Scrubber Filter Change (9/24/2026 - 9/26/2026)
Sta 209 Cambridge: Scrubber Filter (9/21/2026 - 9/23/2026)
Sta 230C: Scrubber / Filter Inspection (M) (9/9/2026 - 9/10/2026)
560
(328)
Sta 264 Charlton: Annual ESD Test (9/23/2026 - 9/24/2026)
220
(577)
MLV 313A-101A to MLV 313A-401: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-101L to MLV 313A-101A: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-403 to MLV 313A-404: Anomaly Remediation (M) (9/7/2026 - 9/19/2026)
MLV 313A-405A to MLV 313A-406: Anomaly Remediation (M) (9/7/2026 -
9/19/2026)
1850
(252)
MLV 321-1L to MLV 322-1: Anomaly Remediation (8/31/2026 - 9/5/2026)
MLV 329
846
830
MLV 329AS-1 to MLV 329AD-1: Valve Replacement - MLV 329-1 (M) (9/9/2026 - 10/9/2026)