Effective Timely Cycle for gas day Saturday, January 18, 2025, and continuing until further notice, SNG restricted the following:
OPERATIONAL FLOW ORDERS (OFO)
Type 3 Level 2 OFO North System will be DOWNGRADED to a Type 3 Level 1 OFO for the start of the gas day, Thursday January 16, 2025, until further notice. Notice ID #710276
Type 3 Level 2 OFO South System will be DOWNGRADED to a Type 3 Level 1 OFO for the start of the gas day, Thursday January 16, 2025, until further notice. Notice ID #710275
RESTRICTIONS (POINT)
· 935100 (IPC/SNG PT WENTWORTH CHATHAM) – Exceeds Operating Capacity – Reductions into OP Services
RESTRICTIONS (SEGMENT)
· 20 (ZONE 0/1 N BOUNDARY) BH – - Exceeds Operating Capacity – Reductions into OP Services
· 50 (LOUISVILLE EAST) – Limited Operating Capacity
· 330 (LA EAST LEG) BH – Exceeds Operating Capacity – Reductions into IT Services
· 380 (SNG-SESH) - Exceeds Operating Capacity – Reductions into OP Services
· 420 (BAY SPRINGS) - Exceeds Operating Capacity – Reductions into OP Services
· 670 (WEBSTER-CLAY) - Exceeds Operating Capacity
· 710 (PAVO) BH – Exceeds Operating Capacity – Reductions through OP Services
· 720 (JACKSONVILLE LINE S GEORGIA) - Exceeds Operating Capacity
· 730 (JACKSONVILLE LINE CYPRESS) - Exceeds Operating Capacity
· 750 (CORDELE AREA LINE) - Exceeds Operating Capacity
RESTRICTIONS (LINEPACK)
Payback Due Pipe – No restrictions
Payback Due Shipper – Not accepting due shipper until further notice
RESTRICTIONS (STORAGE)
None
Type 3 / 4 OFO Probability (Unlikely (UL); Likely (L); Too Close to Call (TC); Highly Likely (HL)
January 9 – OFO until further notice
Type 6 OFO Probability (Unlikely (UL); Too Close to Call (TC); Highly Likely (HL)
January 18, 2025 – UL for Short and UL for Long Imbalances
January 19, 2025 – UL for Short and UL for Long Imbalances
January 20, 2025 – UL for Short and UL for Long Imbalances