STRAINED OPERATING CONDITION (SOC) Declaration - System Wide PACK
EFFECTIVE DATE: December 28, 2022
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: System-wide
OPERATING CONDITION SUMMARY: The EPNG system continues to experience a high linepack condition with system linepack currently above 8,200 MMcf.
Deliveries below scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to insure that system integrity is maintained.
EPNG RESPONSE:
- Washington Ranch is on maximum injection.
- Delivery point operators are encouraged to take gas according to their scheduled quantities into the EPNG system. Additionally, payback to the system will not be accepted as long as we remain in the high linepack condition
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, or Tim Fuller at (719) 520-4339.