STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: February 10, 2019
EFFECTIVE TIME: 8:00 AM MST
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following locations.
DSWG PHW (301120)
DSWG PHX (301122)
DSWG MOH (334808)
DSWG N78 (301115)
DSWG S78 (301126)
DSWG YUM (301142)
DSWG GIL (301105)
DSWG TUS (301133)
DSRP PHX (301043)
OPERATING CONDITION SUMMARY: The continued drafting of the system by the locations listed above undermines our ability to maintain adequate line pack and meet scheduled deliveries. Maintenance on Line 2000 coupled with restricted withdrawal from Washington Ranch limits the ability to support drafting on the system.
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to insure that system pressure remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is on maximum operational withdrawal given the pipeline constraint through Guadalupe.
- Underperformance caps have been placed and will continue to be placed on underperforming supplies.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729 or Dan English at (719) 520-4722.
For media inquiries, please call Lexey Long, (713) 420-4644