STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: January 1, 2019
EFFECTIVE TIME: 8:00 AM MST
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following locations.
IGRIFFITH (320614)
OPERATING CONDITION SUMMARY: The continued drafting of the system by the location listed above undermines our ability to maintain adequate line pack and meet scheduled deliveries.
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to insure that system pressure remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is on maximum operational withdrawal given the pipeline constraints through Guadalupe.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729 or Dan English at (719) 520-4722.
For media inquiries, please call Lexey Long, (713) 420-4644