Colorado Interstate Gas Company, L.L.C.
July 7, 2025
Storage Bottom Hole Pressure Surveys
The four Storage Fields utilized by Colorado Interstate Gas Company, L.L.C. (CIG) to provide No Notice Transportation (NNT) and Storage Services will undergo scheduled Bottom Hole Pressure Surveys from September 16 through October 20, 2025. As explained below, this work will impact firm customers' ability to inject during this period by reducing the regular Available Daily Injection Quantity (ADIQ). For informational purposes, CIG has also included an estimate of withdrawal impacts so customers may plan their business accordingly.
The week that maintenance is scheduled for each field is listed below. Each field's maximum injection and withdrawal capability is shown as well as the field's related percentage of total injections/withdrawals and the net injection/withdrawal available for that week. These numbers are based on the projection that storage inventory will be within normal guidelines at the end of September.
Outage Scheduled
Field
NNT Injection
NNT Withdrawal
Field Contribution to Injection (MMcf/d)
Field Percentage of Total Injection
Total NNT Injection Available during Outage (MMcf/d)
Field Contribution to Total Withdrawal (MMcf/d)
Field Percentage of Total Withdrawal
Total NNT Withdrawal Available during Outage (MMcf/d)
September 16 to September 23
Flank- Cherokee
55*
16.9
245
80
18.7
658
September 24 – October 1
Flank - Morrow
325
797
Latigo
24.6
139
15.8
September 24 to October 1
Ft. Morgan
125
38.5
200
450
51.3
427
October 13 to October 20
Boehm
65
20.0
260
124
14.1
753
*Note: Flank has two reservoirs which will be tested separately. Flank Cherokee reservoir will be tested beginning September 16 through September 23 and Flank Morrow reservoir will be tested beginning September 24 through October 1. The impact to injection capability will be minimal, and no reductions to customer's firm injection rights will be made during these separate Flank Bottom Hole Pressure Surveys.
During the Bottom Hole Pressure Surveys for FT. Morgan, Latigo and Boehm firm shippers' ADIQ will be reduced by the percentage indicted above consistent with Part IV: General Terms and Conditions (GT&C) Sections 1.2(c) and 11.6 of CIG's FERC Gas Tariff Second Revised Volume No.1. For example, during Ft. Morgan maintenance, shippers will be limited to 61.5% (100-38.5) of the Standard ADIQ
Other Impacts to Shippers:
1. Shippers are asked to manage flowing supplies to keep injections and withdrawals within the adjusted limits. If small injection overruns occur, they will be based on the adjusted limits and will be authorized for NNT customers. However, if operational concerns arise because of higher levels of overrun injections, a Strained Operating Condition (SOC) may need to be implemented, and overruns will not be authorized.
2. During the week of the Ft. Morgan outage, injections under the High Available Daily Injection Quantity (High ADIQ) option described in GT&C Section 1.2 will not be supported.
3. Injections to and withdrawals from interruptible storage accounts will not be scheduled during the period of Bottom Hole Pressure Surveys.
Scheduling questions or concerns
Pipeline Scheduling Hotline (800) 238-3764 option 2.
or email CIGSched
Operational issues or concerns Cheryl Bauer at (719) 520-4423 or Vic Villalva at (719) 520-4251
or
Mike Burleson (719) 520-4523.
Marketing questions
Contact your marketing representative.
Cheryl Bauer Manager – CIG Gas Control
Kinder Morgan Western Pipelines
(719) 520-4423