Colorado Interstate Gas Company Operations Planning Report for October 2023 Issued September 19, 2023
Reissued September 27, 2023
Revision: (BHNC) BIG HORN NORTH (Segment 142): 70B – 16” CIG revises pigging operations Rawlins to Muddy Gap to October 4 and October 5.
1
(BHNC) BIG HORN NORTH (Segment 142): 70B – 16” CIG will be performing pigging operations Rawlins to Muddy Gap October 4 and October 5. The outages result in the following impacts.
Dates
Segment
Operating Capacity (MDth/d)
Reduced Capacity (MDth/d)
Northbound
October 4
142
90
50
October 5
40
Southbound
117
0
October 2023
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Wyoming:
(BHNC) BIG HORN NORTH (Segment 142): 70B – 16” CIG will be performing pigging operations Muddy Gap to Lost Cabin October 10 and October 13. The outages result in the following impacts.
October 10
October 13
Colorado:
(CYCC) CHEYENNE COMPRESSOR (Segment 169): Cheyenne Compressor Station, CIG will be performing Station ESD test October 18. The outage results in the following impact.
Westbound
October 18 Cycles 1 thru 4
169
537
315
October 18 Cycle 5
417**
** The nomination limit for this cycle has been prorated for the remaining time in the gas day
(HPPC) HIGH PRESSURE POOL (Segment 182): Cheyenne Compressor Station, CIG will be performing Station ESD test October 18. The outage results in the following impact.
182
631
400
506**
(CHWC) CHEYENNE WEST (Segment 164): Cheyenne Compressor Station, CIG will be performing Station ESD test October 18. The outage results in the following impact.
164
230
269**
South of Springfield, CO (including Texas and Oklahoma):
BAKER MS TO BEAVER CS (Segment 288): Beaver Compressor Station will be out of service October 18 to perform Annual ESD tests. This outage will result in the following impact.
October 18 Cycles 1 thru 3
288
305
206
October 18 Cycles 4 thru 5
268**
Beaver Meter Station (800078): Will be out of service October 18 to perform the Beaver Compressor Station ESD test (Item 6). This outage will result in the following impact.
PIN ID
800078
227
142**
(KECC) KEYES SOUTH (Segment 292): Keyes Compressor Station, CIG will be performing Station maintenance October 10. This outage results in the following impact.
October 10 Cycles 1 thru 4
292
190
October 10 Cycle 5
109**
CIG Storage Guidelines
CIG will be performing bottom hole tests September 17 through October 23. Please refer to the CIG EBB posting #121258 and associated notices. Totem Storage will be performing bottom hole tests September 27 through October 4. Please refer to the CIG EBB posting #121259
CIG Services Utilizing Young Gas Storage Company
Young Gas Storage Company (Young) will be conducting scheduled reservoir maintenance beginning on October 31 through November 7. Please refer to the Young EBB posting #121309 and associated notices. This maintenance is to test the reservoir's integrity and to ensure continued safe and reliable operations of the field. During the test period, no injections or withdrawals will be supported. This capacity outage will impact the following Young interconnect locations; PIN ID 800826 (YCS) and PIN ID 800077 (BCS) with Colorado Interstate Gas Company.
No requests for a Joint Monthly Operating Plan Meeting have been received by CIG. Therefore, pursuant to Section 11.1 of General Terms and Conditions of the FERC Gas Tariff, no such meetings have been scheduled. If any time there are any questions regarding operational issues, do not hesitate to call Cheryl Bauer (719) 520-4423.
Any comments or questions about this report should be directed to Vic Villalva at (719) 520-4251 or Cheryl Bauer at (719) 520-4423.