KIT CARSON CS TO CO/KN ST LINE (Segment 278): CIG updates Pigging schedule to include March 31.
Kansas:
2. KIT CARSON CS TO CO/KN ST LINE (Segment 278): CIG will be performing smart pigging operations March 3, 5, 10, 24 and 31 2A-20” Kit Carson to Lakin Mainline. These outages will result in the following impacts.
Design Capacity Capacity Reduction
Limit (MDth/d) Limit (MDth/d)
March 3 140 90
March 5 140 90
March 10 140 90
March 24 140 90
March 31 140 90
Issued February 17, 2015
Reissued March 27, 2015
The Maintenance reflects the segment and PIN changes associated with the upcoming DART implementation on March 1, 2015
Wyoming: None of the planned maintenance is expected to impact service.
Colorado:
1. PICKETWIRE TO CAMPO RS (Segment 274): CIG will perform Annual DOT tests and unit shutdown checks March 4 at Trinidad Compressor Station. This outage will result in the following impacts.
March 4 Cycles 1 thru 3 436 336
March 4 Cycle 4 436 386**
** The nomination limit for this cycle has been prorated for the remaining time in the gas day.
Utah: None of the planned maintenance is expected to impact service.
South of Springfield, CO (including Texas and Oklahoma):
3. KN/OK ST LINE TO BAKER MS (Segment 286): Morton Compressor Station will be out of service March 19 to perform annual DOT ESD tests. This outage will result in the following impacts.
March 19 Cycles 1 thru 3 367 328
March 19 Cycle 4 367 348**
4. CAMPO RS TO CO/OK ST LINE (Segment 292): On March 25 CIG will perform Annual DOT ESD tests at Keyes Compressor Station. This outage will result in the following impact.
March 25 Cycles 1 thru 3 190 50
March 25 Cycle 4 190 120**
Storage inventory is projected to be within normal guidelines on March 1.
Field Max Inject., MDth/d Max. Withdraw MDth/d
Boehm 65,000 124,000
Flank 65,000 164,000
Ft. Morgan 120,000 450,000
Latigo 75,000 139,000
Totals 325,000 877,000
Note to storage table: Maximum injection and withdrawal figures are based upon projections for gas-in-place on March 1, 2015. Departure from these projections can affect injection and withdrawal capabilities. Thermal quantities were determined based upon an average of 1064 Btu/cf.
Additionally, field maintenance is scheduled during March for each of the storage reservoirs. Please refer to posting #9167 for additional information about the injection limitations based on the expected work schedule.
None of the planned maintenance is expected to impact service.
No requests for a Joint Monthly Operating Plan Meeting have been received by CIG. Therefore, pursuant to Section 4.11.1 of General Terms and Conditions of the FERC Gas Tariff, no such meetings have been scheduled. If at any time there are any questions regarding operational issues, do not hesitate to call Bill McMillan at (719)520-4389.
Any comments or questions about this report should be directed to Glen Petty (719)520-4704 or Bill McMillan (719)520-4389