August 17, 2017
TO: ALL TENNESSEE CUSTOMERS
RE: UPDATED TGP SCHEDULED OUTAGES
This notice is an update of the 2017 planned outages and maintenance
activities on Tennessee Gas Pipeline.
The Outage and Maintenance schedule is available in an Excel
spreadsheet format which may be found in DART.
Some projects may reduce capacity to a level below anticipated
demand (nominations), or require taking individual meters out of
service.
For each project, based upon anticipated demand, the highest
level of service Tennessee expects to be impacted is noted.
Unless noted otherwise, all impacts are in the Supply to Market
direction.
Projects may be added, altered, delayed or canceled. Tennessee
will provide updates by posting revisions on a weekly basis or
more often if necessary.
Projects revised or added since the last posting are preceded
by ***. Within the Excel Spreadsheet and Adobe Files, revisions
are highlighted and an asterisk has been added to the "Revised"
column.
Unless otherwise noted, all listed meters will be physically shut
-in for the duration of the project.
Unless otherwise noted, all scheduled dates represent gas days
as defined in the Tennessee Gas Pipeline tariff to mean a period
of twenty-four consecutive hours, beginning and ending at 9:00
a.m. (Central Clock Time).
=========================
Completed Outages
===="***MLV 120-2: Anomaly Remediation
***Completed
………………………………"
"***MLV 200-4B to MLV 204-4: Anomaly Remediation
"***MLV 204-4 to MLV 208-4: Anomaly Remediation
"***Sta. 209: ESD Test
"***Sta. 209-8A: Unit Maintenance
"***Sta. 317: Cooler, Filter/Separator, & Electrical Tie-Ins
"***MLV 331-2: ILI Run
"***MLV 332-1R2-CR: ECDA
"***MLV 826 to MLV 827: Hydrotest
The following meters are available for nominations:
420296 – FORSTHIL/TGP FOREST HILL LA RAPIDES
412847 - ACADIAN/TGP CHENEYVILLE RAPIDES
"***Sta. 871-2A: Compressor Overhaul
=====================
100 Line Outages
"Sta. 9: Compressor Valve Replacement
--8/23/17 through 8/23/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
"Sta. 17: Station Reversal
--5/31/16 through 8/31/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time. Potential out of path restrictions may be at risk.
"MLV 17-1 to 20-1: Spike Test
--7/31/17 through 9/30/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. The meter listed below will be shut-in for the duration of the project. Potential in the path restrictions may be at risk.
420167 - COKINOS/TGP WOODS FARM TX FORT BEND
420685: DOW P/L/TGP KATY DEHYDRATION TRANSP
411159: ENTRPRSE/TGP KATY DEHY TRANS WALLER
"MLV 17-1 to 12-1: Pressure Weld Replacement
--9/1/17 through 10/31/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. The meter listed below will be shut-in for the duration of the project. Potential in the path restrictions may be at risk.
400454 H-M RES/TGP UDP Egypt North West Dehy
420162 Cokinos/TGP Raun Farm #2
420479 Cokinos/TGP Cattle Farm (Garwood PD)
412023 HGI/TGP Englehardt (Garwood Plate) Colorado
420332 Cokinos/TGP Nitsch Farm
421054 Cokinos/TGP Swanson Farm
420467 Cokinos/TGP Holob Farm
420466 Cokinos/TGP Holt Farm
420442 Cokinos/TGP Rasmussen Farm (Abeulo)
412723 Patterson/TGP Hill
412523 UES/TGP Wildcat Rasmussen #1
420369 Cokinos/TGP Wiggington Farm
420183 Cokinos/TGP Krenek Farm
420158 Cokinos/TGP Raun Farm #1
420185 Cokinos/TGP Ottis Farm
"Sta. 25: ESD Test
--8/28/17 through 9/1/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
"Bear Creek: Shut-In Test
--10/17/17 through 10/23/17: This project will require a storage outage.
"MLV 41-2A to 42-2: Bi-Directional Trap Installation
--8/7/17 through 9/22/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 41-4 to 42-4: Anomaly Remediation
--7/10/17 through 8/4/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 46-3 to 47-3: MLVS 46-3 New Meter Tie-In
--8/25/17 through 8/31/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"Sta. 47: Hydrotest
--9/18/17 through 10/13/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 47-1 to 49-1: Spike Test
--5/23/17 through 7/24/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 47-1 to 54-1: ILI/Cleaning: 5/3 - 8/7, 8/9, 8/17 & 8/17
--8/7/17 through 8/17/17: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 47-2 to 48-2: Spike Test
--7/3/17 through 9/15/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. The meter listed below will be shut-in for the duration of the project. Potential out of path restrictions may be at risk.
47872 - ATMOS/TGP CHAUVIN OUACHITA
"MLV 57-3 to 58-3: Pipe Remediation
--11/18/16 through 10/31/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 67-2 to 68-2: Hydrotest
--9/4/17 through 10/13/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 70-4, 2, 1 and South Header: Hydrotest
--7/7/17 through 11/3/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 77-1 to 77-1B2: Hydrotest
--8/21/17 through 10/7/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 78-2 to 79-2: Pipe Replacement
--11/6/17 through 11/18/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 78-4 to 79-4D: Pipe Replacement
--10/23/17 through 11/4/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 96-2 to 87-2: ILI/Cleaning: 8/22, 8/24 & 8/29
--8/22/17 through 8/29/17: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 106-4D to 108-4: Spike Test
--7/20/17 through 10/7/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 118-1: Broad Run Expansion Tie-In
--11/27/17 through 12/10/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"MLV 119-2: Broad Run Expansion Tie-In
--10/1/17 through 12/31/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"***MLV 119-2: Pipe Replacement
--10/9/17 through 10/15/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
***Date Change, Previously scheduled 10/2/17 to 10/15/17.
200 Line Outages
"***Sta. 204: ESD Test
--11/13/17 through 11/17/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
***Date Change, Previously scheduled 10/16/17 to 10/20/17.
"Sta. 204-1A: Unit Maintenance
--8/14/17 through 8/18/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"Sta. 204-3A: Unit Maintenance
--7/31/17 through 8/11/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential in the path restrictions may be at risk.
"MLV 205-1 to 206-1: Anomaly Remediation
--8/14/17 through 8/30/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential in the path restrictions may be at risk.
"***Sta. 209-7A: Unit Maintenance
--8/7/17 through 8/25/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
***Date Change, Previously scheduled 8/7/17 to 8/18/17.
"***Station 214: Header Piping Modifications
***Date Change, Previously scheduled 9/18/17 to 9/21/17.
"Sta. 214-1A: Foundation Replacement
--3/27/17 through 8/1/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"***Sta. 214-10A: Unit Valve Replacement
--11/18/17 through 12/18/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
***Date Change, Previously scheduled 9/22/17 to 10/20/17.
"MLV 224-2 to Kinder Road: Anomaly Remediation
--8/28/17 through 9/8/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 229-2 to MLV 232-2: Anomaly Digs
--8/24/17 through 8/30/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 237-1: SCCDA
--8/28/17 through 9/2/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 251-2 & 251-3: Tie-In
--7/23/17 through 7/29/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"MLV 251-1 & 251-3: Tie-In
--8/3/17 through 8/25/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 257-3: Tie-In
--7/24/17 through 8/3/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 258-1 & 2: Hot Tap
--8/21/17 through 8/24/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential in the path restrictions may be at risk.
"MLV 260-1 to 261-1A: Tie-In
--9/5/17 through 9/11/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 260-2: ECDA
--9/4/17 through 9/16/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"Sta. 261-1D: Unit Maintenance
--8/14/17 through 8/18/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 265A-100: Anomaly Remediation
--8/14/17 through 8/25/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 265C-100: Anomaly Remediation
"***Sta. 266A: Controls Replacement
--8/28/17 through 10/20/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. The listed meter below might experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
420285 – AGT/TGP MENDON MASS TIE OVER WORCHE
***Date Change, Previously scheduled 9/6/17 to 10/20/17.
"MLV 268A-200: ECDA
--8/7/17 through 8/19/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 270C-103: ILI/Cleaning
--7/5/17 through 8/9/17: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 270C-102 to 270C-104: ILI/Cleaning Pig
--8/4/17 through 8/9/17: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated. Potential out of path restrictions may be at risk.
"***MLV 270C-1100 to 270C-1101: ILI/Cleaning
--8/21/17 through 8/31/17: This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated. Potential out of path restrictions may be at risk.
***Date Change, Previously scheduled 8/7/17 to 8/16/17.
300 Line Outages
"Sta. 307-4A: Unit Maintenance
--5/15/17 through 9/30/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"Sta. 313-1A - 9A: Jacket Water Repair
--8/15/17 through 8/21/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"Sta. 313A: Harrison Storage Shut-In Test
--10/10/17 through 10/13/17: This project will require a storage outage.
"Sta. 313: ESD Test
--10/18/17 through 10/19/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
"Sta. 313A: Ellisburg Storage Shut In Test
--10/30/17 through 11/3/17: This project will require a storage outage.
"Sta313: Hebron Storage Shut In Test
"***Sta. 317-1B & 1C: Unit Restage & Commissioning
--8/20/17 through 8/24/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
***Added
"Sta. 317: Electrical Tie-Ins Outage
--10/2/17 through 10/6/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"MLV 320-1 & 2: Hot Tap
--9/18/17 through 9/29/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"Meter 420203: Meter Station Upgrade
--6/23/17 through 9/1/17: This project will require a meter station outage. The listed meter below will be shut-in for the entire duration of the project.
420203 - UGIPENN/TGP UNIONDALE PA SUSQUEHANNA
"MLV 321-2 to MLV 325-2: Anomaly Remediation
--8/21/17 through 8/26/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential in the path restrictions may be at risk.
"Sta. 323-1A & 2A: Performance Test (Bypass Line 1 on 2A Outage)
--9/5/17 through 9/8/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
"MLV 325-1 to MLV 329-1: Anomaly Digs
--8/28/17 through 11/13/17: This outage will require pressure reductions and possibly line isolations. This will limit throughput and will result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential in the path restrictions may be at risk.
"MLV 329B-100: ECDA
--8/14/17 through 8/26/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"***MLV 354-1: Tie-In
--8/14/17 through 8/21/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
***Date Change, Previously scheduled 8/28/17 to 8/31/17.
"***MLV 355-1: Connecticut Loop Tie-In
--8/28/17 through 8/31/17: This project will require taking the pipeline section out of service. This will limit throughput and will result in restrictions based on customer nominations. Customers may experience pressure and flow fluctuations. Potential out of path restrictions may be at risk.
400 Line Outages
"Sta. 409A: Automation Controls Upgrade
--9/18/17 through 10/13/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential in the path restrictions may be at risk.
500 Line Outages
"Sta. 500C1: Controls Upgrade
--10/22/17 through 11/7/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 507F-104 to 507F-101: Cleaning Pig
--8/23/17 through 8/23/17: This activity will require operating at controlled flow rates. The meter listed below will be shut-in for the entire duration of the runs. Potential out of path restrictions may be at risk.
410671 – TARGA/TGP UDP LOWRY PLANT DEHY CAME
412680 – TRUNKLNE/TGP LACASSINE JEFFERSON DA
450302 – VAR/TGP CHENIEW STRADDLE PLT INLET
"MLV 507-1D to 516-1: Anomaly Remediation
--8/14/17 through 8/18/17: This outage will require pressure reductions and possibly line isolations. However no other service impact is anticipated. Potential out of path restrictions may be at risk.
"MLV 534: Drip Removal
--8/8/17 through 8/30/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. The meter listed below will be shut-in during the scheduled dates listed below. Potential out of path restrictions may be at risk.
8/22/2017 - 9/1/2017
420719 - WILLMUT/TGP CAMP SHLEBY FORREST
"MLV 547J-101 to 547J-102: ILI/Cleaning: 8/29 & 8/30
--8/29/17 through 8/30/17: This activity will require operating at controlled flow rates. Potential out of path restrictions may be at risk.
The listed meter below may experience small pressure fluctuation for the duration of the runs:
420694 – AXIALL/TGP MISSISSIPPI TRANSPORT MO
The listed meter below will be shut-in while for a couple of hours while the pig passes:
420765 – ATMOS-MS/TGP ABERDEEN SALES MONROE
700 Line Outages
"MLV 702-1: Hydrotest
--9/5/17 through 9/30/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. The meters listed below will be shut-in for the duration of the project: Potential out of path restrictions may be at risk.
410031 - ETX GAS/TGP EAST TX PLANT DEHY PANO
411200 - VAR/TGP ENTEX PANOLA TRANSPORT PANO
411330 - TEXLA/TGP CHEMARD LAKE DEHY DE SOTO
411525 - PETROQUE/TGP BELLE BOWER DEHY PANOL
412033 - MARLIN/TGP CARTHAGE TRANSPORT PANOL
412081 - EPE/TGP UDP BETHANY LONGSTREET FIEL
412141 - ETP/TGP CARTHAGE GAS UNIT 13 PANOL
412607 - EPE/TGP UDP HOLLY FIELD DE SOTO
412610 - MAGNUMPL/TGP WEST MANSFIELD DE SOTO
412688 - ENBRIDGE/TGP PANOLA TRANSPORT 2 PAN
412725 - EAGLROCK/TGP UDP DE SOTO
412759 - UES/TGP UDP BURFORD GATHERING: RIP
412764 - ENT GATH/TGP UDP STATE LINE PROCESS
412775 - EOG/TGP TRENTON SALES: RIP 703H-1 5
412807 - ETC FS/TGP LOGANSPORT B: RIP 704H 1
420723 - ETP/TGP CARTHAGE GAS UNIT 13 PANOLA
412819 – LOUISMID/TGP CONVERSE CENTRAL: RIP
412706 – ETC/TGP LOGANSPORT DE SOTO
412765 – EMP/TGP HARRIS 19.1: RIP 703G 101.1
412583 – GCENGY/TGP BENSON AND CONVERSE DE S
411755 – IND MKTG/TGP GROGAN FIELD DE SOTO
800 Line Outages
"Sta. 823: Cooling System Upgrade
--9/1/17 through 11/30/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers in the area may experience higher than normal pressure for the duration of the outage. Potential out of path restrictions may be at risk.
"Sta. 827: Station Reversal
--5/9/17 through 8/17/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 827-1 to 823-1: ILI/Cleaning: 9/11, 9/12 & 9/14
--9/11/17 through 9/15/17: This activity will require operating at controlled flow rates. Potential out of path restrictions may be at risk.
The meters listed below will be shut-in for the entire duration of the run.
421043 – PINE PRA/TGP PINE PRAIRIE NORTH RAP
412847 – ACADIAN/TGP CHENEYVILLE RAPIDES
The meters listed below will be temporarily shut in while the pig passes.
412713 – HUGHES E/TGP UDP BLACK STONE 13 EVAN
412844 – TEXLA/TGP ROY MARTIN GATHERING: RIP
420296 – FORSTHILL/TGP FOREST HULL LA RAPIDES
420530 – GLNMORA/TGP GLENMORA LA EXCH RAPIDE
421042 – ELIZ NG/TGP EVANGELINE SALES EVANGE
420629 – ELIZ NG/TGP OAKDALE DETENTION SALES
420687 – ELIZ NG/TGP ALLEN PARISH PRISON SAL
420406 – ELIZ NG/TGP ELIZABETH LA EMERGENCY
"Sabine to MLV 823-1: ILI/Cleaning: 9/25, 9/26 & 9/28
--9/26/17 through 9/29/17: This activity will require operating at controlled flow rates. Potential out of path restrictions may be at risk.
The meter listed below will be shut-in for approximately 1 hour while the pig passes:
420581 – ENTRGYLA/TGP BECKWITH CREEK CALCASI
The meters listed below will be shut-in for the entire duration of the pig run:
412768 – GLDNPASS/TGP STARKS LNG: RIP 820 10
412737 – LBERTYGS/TGP UDP DE QUINCY GAS STOR
412013 – ENTRPRSE/TGP SABINE RIVER TRANS NE
"Sta 834: Station Outage
--6/1/16 through 7/31/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time. Potential out of path restrictions may be at risk.
"Sta. 836A: Station Tie-In
--8/21/17 through 8/31/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Producers in the area could experience higher than normal operating pressures. Potential out of path restrictions may be at risk.
"MLV 836 to MLV 837: Delhi Lateral Tie-In
--8/21/17 through 8/31/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"MLV 846-1 to MLV 847-1: Hydrotest
--9/15/17 through 10/15/17: This project will require taking the pipeline section out of service. This will limit throughput and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
420328 - ATMOS-MS/TGP HARDY STA MS GRENADA
"Sta. 847: Station Reversal
--8/12/17 through 12/14/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"Sta. 847: Hydrotest
"Sta. 871-3A: Power Side Overhaul
--8/14/17 through 9/15/17: This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations. Potential out of path restrictions may be at risk.
"Sta. 875: Tie-Ins
--9/11/17 through 9/30/17: This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Producers in the area could experience higher than normal operating pressures. Potential out of path restrictions may be at risk.
If you have any questions, please contact your Scheduler.