August 18, 2016

 

TO:  ALL TENNESSEE CUSTOMERS

 

RE:  UPDATED TGP SCHEDULED OUTAGES

 

This notice is an update of the 2016 planned outages and maintenance

activities on Tennessee Gas Pipeline.

 

The Outage and Maintenance schedule is available in an Excel

spreadsheet format which may be found in DART.

 

Some projects may reduce capacity to a level below anticipated

demand (nominations), or require taking individual meters out of

service. 

 

For each project, based upon anticipated demand, the highest

level of service Tennessee expects to be impacted is noted. 

Unless noted otherwise, all impacts are in the Supply to Market

direction.

 

Projects may be added, altered, delayed or canceled.  Tennessee

will provide updates by posting revisions on a weekly basis or

more often if necessary.

 

Projects revised or added since the last posting are preceded

by ***.  Within the Excel Spreadsheet and Adobe Files, revisions

are highlighted and an asterisk has been added to the "Revised"

column.

 

Unless otherwise noted, all listed meters will be physically shut

-in for the duration of the project.

 

Unless otherwise noted, all scheduled dates represent gas days

as defined in the Tennessee Gas Pipeline tariff to mean a period

of twenty-four consecutive hours, beginning and ending at 9:00

a.m. (Central Clock Time).

 

=========================

Completed Outages

=========================

"***9-1 to 10-1:  Drip Removal

***Completed

………………………………"

"***Sta. 261 -1D, 5A & 1C:  Unit Maintenance

***Completed

………………………………"

"***325-1 to 329-1:  Anomaly Remediation

***Completed

………………………………"

=========================

100 Line Outages

=========================

"MLV 404-2 to 404-2:  Hydrotest

--9/19/16 through 10/31/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"***MLV 1-1D to 9-1S:  ILI/Cleaning Pig: 9/21 & 9/22

--9/21/16 through 9/22/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 9/7/16 to 9/9/16.

………………………………"

"Sta 9:  Unit Work

--3/19/16 through 8/31/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 9-1D to 17-1S:   ILI/Cleaning Pig: 9/27 & 9/29

--9/27/16 through 9/29/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 9/12/16 to 9/14/16.

………………………………"

"***9-2 to 10-2:  Drip Removal/Hydrotest

--8/29/16 through 9/17/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 8/15/16 to 8/20/16.

………………………………"

"***9-3 to 10-3:  Drip Removal/Hydrotest

--8/16/16 through 8/26/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 8/29/16 to 9/10/16.

………………………………"

"Sta 17:  Station Reversal

--5/31/16 through 5/31/17:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 17-1D to 20-1A:  ILI/Cleaning Pig: 9/16 & 9/19

--9/16/16 through 9/19/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 17-4:  Pipe Replacement

--7/11/16 through 8/13/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 24-1A to 25-1S:  ILI/Cleaning Pig: 9/7 & 9/9

--9/7/16 through 9/9/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 9/21/16 to 9/22/16.

………………………………"

"***MLV 25-1D to 32-1S:  ILI/Cleaning Pig: 9/12 & 9/14

--9/12/16 through 9/14/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 9/27/16 to 9/29/16.

………………………………"

"MLV 29-1 to 31-1:  Pressure Weld Replacement

--6/17/16 through 8/26/16:  This project will require taking the pipeline section out of service.  The listed meters will be shut-in during this time. This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

421071 – VART/TGP WOODVILLE PLANT: DIP 30C 10

412632 – ANADARKO/TGP WOODVILLE DEHYD TYLER

………………………………"

"MLV 29-3 to 31-3:  Pipe Replacement

--9/1/16 through 10/1/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 40-4S:  Hydrotest

--8/1/16 through 10/1/16:  This project will require taking the pipeline section out of service.  The listed meters will be shut-in during this time. This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 40-4D to 41-4:  Anomaly Digs

--9/19/16 through 9/30/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 42-4 to 44-4:  Anomaly Remediation

--8/1/16 through 9/17/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta 47:  Station Reversal

--5/23/16 through 9/1/16:  This project will require building outages, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Bear Creek:  Storage

--10/18/16 through 10/24/16:  This project will require a storage outage, which will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 54-3D to 56-4:  Hydrotest

--10/3/16 through 11/23/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 54-3A:  New MLV Install

--10/3/16 through 12/9/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"54-2D to 63-2S:  Anomaly Remediation

--6/22/16 through 7/2/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"54-4D to 63-4S:  Anomaly Remediation

--6/11/16 through 6/21/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 78-2:  Pipe Replacement

--8/22/16 through 9/1/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Station 79:  Station Reversal

--1/1/17 through 12/31/17:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"82-2C to 87-2S:  Anomaly Remediation

--4/18/16 through 6/29/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"82-2C to 87-2:  ILI Pig

--5/24/16 through 8/24/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 84-1 to 85-1:  Line Outage

--8/2/16 through 8/13/16:  This project will require taking the pipeline section out of service.   This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 87:  ESD Test

--10/18/16 through 10/18/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"MLV 87-1D to 96-1S:  ILI/Cleaning Pig

--8/24/16 through 8/30/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 96-2B to 100-2 & MLV 100-2 to 102-2:  Hydrotest

--7/11/16 through 12/10/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 96-4D to 98-4D:  Hydrotest

--7/11/16 through 8/29/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"96-3D to 98-3:  Spike Test

--8/22/16 through 10/1/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"97-5:  Pipe Replacement

--6/1/16 through 9/7/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"96-5D to 98-5:  Spike Test

--6/1/16 through 7/5/16:  This project will require taking the pipeline section out of service.  This will limit throughput and may result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 105-2L (Begin Loop) to 106-2S:  ILI/Cleaning Pig

--9/13/16 through 9/16/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 114:  ESD Test

--10/12/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

420924 Riverside/Lawrence

………………………………"

"MLV 121-1 to 122-1:  Trap Modifications

--9/5/16 through 9/23/16:  This outage will require the pipeline to be taken out of service.  For the duration of the project, TGP will only be able to receive gas from the listed meter.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

420044 - DOMINION/TGP BROAD RUN CORNWELL KAN

………………………………"

"MLV 121-2 to 122-2:  Trap Modifications

--10/3/16 through 10/21/16:  This outage will require the pipeline to be taken out of service. For the duration of the project, TGP will only be able to deliver gas to the listed meter.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

420044 – DOMINION/TGP BORAD RUN CORNWELL KAN

………………………………"

=========================

200 Line Outages

=========================

"Sta. 200-10A & 5A:  Unit Maintenance

--9/6/16 through 9/22/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"***Sta. 200-1B:  Unit Maintenance

--10/3/16 through 10/13/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

***Added

………………………………"

"Sta. 204-3A thru 8A:  Unit Maintenance

--8/10/16 through 8/27/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"Sta 204:  Station Outage

--10/18/16 through 10/24/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"MLV 213:  Hot Taps

--9/12/16 through 9/15/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta 229:  Station Outage

--9/13/16 through 9/26/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"Sta. 237-2A:  Control Panel Replacement

--5/18/16 through 8/10/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"241-3A,1B,2B:  Control Panel Replacement

--8/15/16 through 10/21/16:  This project will require a station and unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta 241:  Control Panel Replacement

--9/7/16 through 10/21/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 241-2B:  Unit Maintenance

--8/1/16 through 8/19/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 245-1 to MLV 249-1:  Maintenance Pig

--9/19/16 through 9/23/16:  This activity will require operating at controlled flow rates for 1 day during the month of September.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 245-2 to MLV 249-2:  Maintenance Pig

--10/17/16 through 10/21/16:  This activity will require operating at controlled flow rates for 1 day during the month of September.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 251-2 & 251-3:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"***MLV 251-1 & 251-3:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"***Sta. 254:  Borescope Inspection

--8/31/16 through 9/1/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 9/1/16.

………………………………"

"***MLV 257-3:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe

………………………………"

"Sta. 260A - 1A:  Unit Maintenance

--7/25/16 through 7/29/16:  This project will require an unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 260-1 to 261-1 :  Line Tie-Ins

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"***MLV 260-1 to 261-1A:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"Sta. 261:  Unit Maintenance

--10/3/16 through 10/7/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 261-1 to 261-1A:  Line Tie-Ins

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"Sta. 261-5A:  Unit Maintenance

--10/19/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 261-1C:  Unit Maintenance

--10/18/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 261-1D:  Unit Maintenance

--10/17/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 261-1D:  Unit Maintenance

--6/13/16 through 6/17/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 261-1C:  Control Panel Replacement

--9/5/16 through 10/3/16:  This project will require an unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 261:  Block Valve Installation

--9/5/16 through 9/12/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 261-1 to 261-1A:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"Sta. 266A:  Unit Maintenance

--9/12/16 through 9/16/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 264:  Unit Maintenance

--10/3/16 through 10/7/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 264-1C:  Unit Maintenance

--10/10/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 264-2C:  Unit Maintenance

--10/11/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 264A-101.1 to 264A-101.1:  Pipe Inspection

--8/22/16 through 8/27/16:  This project involves inspecting multiple sites.  We do not anticipate having to do any repairs; however, if a repair is needed, there is a potential that the pipe may require replacement which will require isolation of the pipe.  This may limit throughput.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 265E:  Station Maintenance

--11/5/16 through 11/12/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 265E-201 to 265E-201:  Pipe Inspection

--8/22/16 through 8/25/16:  This project involves inspecting multiple sites.  We do not anticipate having to do any repairs; however, if a repair is needed, there is a potential that the pipe may require replacement which will require isolation of the pipe.  This may limit throughput.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 266A:  Station Maintenance

--9/14/16 through 9/15/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

420285 – AGT/TGP MENDON MASS TIE OVER WORCHE

………………………………"

"Sta. 266a:  Unit Maintenance

--8/22/16 through 8/26/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 266a:  Unit Maintenance

--8/29/16 through 9/2/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 267:  ESD

--8/16/16 through 8/17/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 267:  Block Valve Installation

--9/21/16 through 9/28/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

 

=========================

300 Line Outages

=========================

"302-1 & 302-2:  Hot Tap

--9/24/16 through 9/26/16:  This outage will require pressure reductions and possibly line isolations.  Outage will take approximately 2 weeks within this time frame. However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 307-1 to Sta. 219-1:  Efficiency Pigging

--10/3/16 through 10/17/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations. The listed meters will be shut-in during the pig run only.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

420730 - NFG/TGP CRANBERRY SMS VENAGO

………………………………"

"Sta. 307-2 to Sta. 219-2:  Efficiency Pigging

--10/3/16 through 10/17/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"***Harrison:  Storage

--10/10/16 through 10/14/16:  This project will require a storage outage, which will limit throughput and may result in restrictions based on customer nominations. 

***Added

………………………………"

"***Ellisburg:  Storage

--10/31/16 through 11/4/16:  This project will require a storage outage, which will limit throughput and may result in restrictions based on customer nominations. 

***Added

………………………………"

"MLV 313-2A to 315-2:  ILI/Cleaning Pig

--9/28/16 through 9/29/16:  This activity will require operating at controlled flow rates.   The listed meters may be required to reduce their flows depending on the current system conditions.  Customers may experience pressure fluctuations, however, no other service impact is antic  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

420253 UGICNTRP/TGP WELLSBORO PA TIOGA

420914 DOMINION/TGP SABINSVILLE DELIVERY T

………………………………"

"MLV 315-2 to 317-2:  ILI/Cleaning Pig

--9/14/16 through 9/15/16:  This activity will require operating at controlled flow rates.   Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 317:  Station Maintenance

--9/7/16 through 9/20/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 323-1A:  Unit Maintenance

--9/18/16 through 10/17/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 325-4A:  Unit Maintenance

--9/1/16 through 10/15/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary in the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP, SIP) nominations.

………………………………"

"340A-101.1:  ECDA

--9/1/16 through 9/10/16:  We do not anticipate having to do any repairs; however, if a repair is needed, there is a potential that the pipe may require replacement which will require isolation of the pipe.  This may limit throughput.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"343A-100:  Pressure Test

--7/8/16 through 8/26/16:  This project will require taking the pipeline section out of service.  The listed meters will be shut-in for the entire length of the outage.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

The only meter that will be impacted (shut-in) the Bridgeport Meter (420126) MORTIMER

………………………………"

"345A-101:  DERBY DELIVERY LINE ECDA

--9/12/16 through 9/20/16:  This project involves inspecting multiple sites.  We do not anticipate having to do any repairs; however, if a repair is needed, there is a potential that the pipe may require replacement which will require isolation of the pipe.  This may limit throughput.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***MLV 354-1:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

"***MLV 355-1:  Tie-In

--(2nd/3rd Qtr. 2017 – Exact Dates TBD):  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled September/October Timeframe.

………………………………"

 

=========================

500 Line Outages

=========================

"MLV 513-1:  Pipe Replacement

--10/17/16 through 11/3/16:  This project will require taking the pipeline section out of service.   This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 534-1A to 538-1:  ILI/Cleaning Pig:  (October/November Timeframe)

--(October/November Timeframe – Exact Dates TBD): This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 538-1 to 542-1:  ILI/Cleaning Pig: (October/November Timeframe)

--(October/November Timeframe – Exact Dates TBD): This activity will require operating at controlled flow rates. Customers may experience pressure fluctuations; however, no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 542-1A:  Unit Maintenance

--6/16/16 through 7/15/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 542-2A:  Unit Maintenance

--6/16/16 through 8/31/16:  This project will require a unit outage, which could limit throughput through the station and result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 542:  Trap Modifications

--8/30/16 through 10/24/16:  This outage will require the pipeline to be taken out of service.  For the duration of the project, pressures may be lower.  This project may limit throughput and could result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"***545-1 & 545-2:  Meter Install (Hot Taps)

--10/24/16 through 10/30/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

***Date Change, Previously scheduled 10/17/16 to 10/23/16.

………………………………"

"Sta. 550:  Station Maintenance

--7/6/16 through 7/12/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 550:  ESD Test

--8/9/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"Sta. 550:  Trap Modifications

--9/15/16 through 10/20/16:  This outage will require the pipeline to be taken out of service.  For the duration of the project, pressures may be lower.  This project may limit throughput and could result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

=========================

800 Line Outages

=========================

"820-1 & 821-1:  Pipe Painting

--8/29/16 through 11/1/16:  This project involves inspecting and making repairs at multiple pipeline sites within the noted valve sections.   We anticipate being able to make repairs while the line is in-service; however, there is a potential that the pipe repair may require replacement.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

412013 ENTRPRSE/TGP SABINE RIVER TRANS NEW

412737 LBERTYGS/TGP UDP DE QUINCY GAS STOR

420581 VARIBUS/TGP BECKWITH CREEK CALCASIE

401366 TRNSCO/TGP UDP UTOS EXCH CAMERON  

412013 ENTRPRSE/TGP SABINE RIVER TRANS NEW

412015 HEC/TGP STARKS HANKAMER  1 CALCASIE

412461 NEUMIN/TGP NEUMIN DEHYDRATION CALCA

412690 HPL/TGP SABINE NEWTON             

412737 LBERTYGS/TGP UDP DE QUINCY GAS STOR

412768 GLDNPASS/TGP STARKS LNG: RIP 820 10

412839 DUNCAN/TGP LABOKAY NO. 1: RIP 820P

420550  ENTRPRSE/TGP SABINE RIVER   (1 6179

412597  COKINOS/TGP TEMPLE INLAND NO 1 CALC

411211    Starks Louisiana Transport

412493   Lawthon Dehyd

412717     Burlington (Duncan)

………………………………"

"MLV 821-1:  Pipe Replacement

--8/29/16 through 11/1/16:  This project will require taking the pipeline section out of service.  The listed meters will be shut-in for the entire length of the outage.  This will limit throughput and will result in restrictions based on customer nominations.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

412015 HEC/TGP STARKS HANKAMER  1 CALCASIE

412461 NEUMIN/TGP NEUMIN DEHYDRATION CALCA

412737 LBERTYGS/TGP UDP DE QUINCY GAS STOR

412768 GLDNPASS/TGP STARKS LNG: RIP 820 10

420581 VARIBUS/TGP BECKWITH CREEK CALCASIE

 

The outage mentioned above will sever TGP 800-1 line (segment 820).  The meters listed below are located upstream of the outage, however, they will be isolated from the remainder of the TGP System.  For this reason, scheduled receipt volumes must equal scheduled delivery volumes in this area.

412690 – HPL/TGP Sabine Newton

412013 – Enterprise/TGP Sabine River

411586 TRNSCO/TGP STARKS LA TRANSPORT CALC

………………………………"

"Sta. 823:  Station Outage

--9/12/16 through 9/22/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. The listed meters may be impacted as a result of higher than normal pressures on TGP's system.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

450303 - TGP/TGP GRAND CHENIER STRADDLE PLAN

………………………………"

"Sta 834:  Station Outage

--6/1/16 through 9/9/16:  This project will require a station outage, which will limit throughput through the station and may result in restrictions based on customer nominations. Customers may experience an increase in pressures during this time.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"

"MLV 851-1 to 856-1:  Anomaly Remediation

--6/27/16 through 7/1/16:  This outage will require pressure reductions and possibly line isolations.  However no other service impact is anticipated.  Potential restrictions through a pro-rata portion of Secondary out of the Path (PAL-D (Park Withdrawals/Loans), IT, AOT, EDS/ERS, Payback From Tennessee, PAL-T (Park Withdrawals/Loans), SOP) nominations.

………………………………"