POINT OPERATOR LIMITATION – NIPSCO CDP
Please refer to the notice entitled “Segment 36 – North Hayden (CS 113) – Install Launcher & Receiver – Update #3” (last posted on July 26, 2017). During this work, Natural's delivery pressure to NIPSCO will continue to exceed its tariff minimum pressure. However, in conjunction with this work, NIPSCO has informed Natural that NIPSCO will have limitations to their total take away capabilities at the CDP with Natural, which will require a lower confirmation volume at the NIPSCO CDP interconnect (LOC 909260). As such, the maximum delivery volume NIPSCO will be able to confirm during this outage will be 400,000 dth per day. (Note that this volume is subject to change daily as determined by NIPSCO.) Based upon this notice of confirmable delivery volume provided by NIPSCO, Natural will accordingly confirm for delivery up to such volumes at the NIPSCO CDP on a daily basis for the duration of this outage.
In applying these confirmable volumes provided by NIPSCO to Natural, effective for gas day Tuesday, August 1, 2017, and continuing through gas day Thursday, August 31, 2017, Natural will administer in DART the lower confirmations given by NIPSCO at their CDP (LOC 909260) and balance our system accordingly. Shippers should continue to monitor Natural's scheduled quantity window for all confirmation activity.
Please contact your Account Director or Scheduling Representative if you have any questions.