Location
Base Capacity (MDth)
Mon 1
Tue 2
Wed 3
Thu 4
Fri 5
Sat 6
Sun 7
Mon 8
Tue 9
Wed 10
Thu 11
Fri 12
Sat 13
Sun 14
Mon 15
Tue 16
Wed 17
Thu 18
Fri 19
Sat 20
Sun 21
Mon 22
Tue 23
Wed 24
Thu 25
Fri 26
Sat 27
Sun 28
Mon 29
Tue 30
Wed 31
BONDADST
726
74
CAPROCK N
614
60
144
159
CORN LPW
1162
36
CRANEUPT
230
0
CRANEWNK
288
DUMAS E
173
DUMAS S
316
HACKBRY
1975
310
KEYST ST
769
16
KEYSTAFL
KEYSTBFL
271
L2KKEYST
215
L2KWAHA
267
LORDSBRG
714
44
MOJAVE
400
54
MOJTHRU
463
117
NORTH ML
2163
514
95
149
158
5
PECOS
31
PUC WAHA
130
SJ TRI
2825
WA ST2DS
842
198
WAHA GE
600
318
ISJRVPLT/ISJRVPLT/ISJRVPLT/ISJRVPLT (314603)
DKERMFUL/DKERMFUL (314874)
DGDNITBY (316116)
DWTG KWX (331543)
8
IGDNIGHT (334856)
111
ITEXNEUN (377034)
270
Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Reduction Dthd
Net Dthd
Update
07/01/19
NM
Line 1204 smart pig Hackberry to Franconia rescheduled
1,975,400
-
07/02/19
Line 1204 smart pig Hackberry to Franconia
309,600
1,665,800
07/03/19
07/06/19
Line 1204 smart pig Hackberry to Franconia postponed
Line 1204 pipeline remediation Seligman to Hackberry Line 1200 smart pig Dilkon to Flagstaff Force Majuere #6045706 Seligman 1C - Reduction 105,400 Dth
2,162,800
513,700
1,649,100
Line 1204 pipeline remediation Seligman to Hackberry Line 1200 smart pig Dilkon to Flagstaff rescheduled Force Majuere #6045706 Seligman 1C - Reduction 105,400 Dth
07/04/19
Line 1204 pipeline remediation Seligman to Hackberry Force Majuere #6045706 Seligman 1C - Reduction 105,400 Dth
07/05/19
07/08/19
07/09/19
Line 1200 pipeline remediation MLV 31 to Williams Line 1204 pipeline remediation Seligman to Hackberry Line 1204 smart pig Leupp to Flagstaff Window Rock 4B maintenance Force Majuere #6045706 Seligman 1C - Reduction 105,400 Dth
07/10/19
Line 1204 pipeline remediation Seligman to Hackberry completed early Window Rock 4B maintenance Line 1200 pipeline remediation MLV 31 to Williams Force Majeure Seligman 1C - Reduction 94,300 Dth
94,600
2,068,200
07/11/19
Line 1204 pipeline remediation Seligman to Hackberry completed early Line 1204 smart pig Leupp to Flagstaff Window Rock 4B maintenance Line 1200 pipeline remediation MLV 31 to Williams Force Majeure Seligman 1C - Reduction 94,300 Dth
149,400
2,013,400
07/12/19
07/13/19
07/15/19
Line 1204 pipeline remediation Seligman to Hackberry completed early Line 1200 pipeline remediation MLV 31 to Williams Force Majeure Seligman 1C - Reduction 94,300 Dth
07/16/19
Line 1204 smart pig MLV 31 to Williams
158,400
2,004,400
07/23/19
07/24/19
Leupp 2A inspection Window Rock 5B maintenance
4,900
2,157,900
SJ
Line 1205 smart pig Bondad to Blanco higher pressures
726,500
73,600
652,900
314603
Line 1200 Hydro Test MLV 0 to EOL CCI/EPNG (ISJRVPLT) San Juan River Pin 314603 maintenance completed early and will be raised in ID1 for July 5, 2019 of Timely Cycle 1.
60,243
White Rock Station DOT/ESD Test Line 1212 maintenance pig VLV 1 to VLV 3 1/4 pressures higher informational only
2,825,200
271,100
2,554,100
White Rock Station DOT/ESD Test
XO
Line 1300 pipeline remediation Blue Water to Valve City
613,900
59,700
554,200
144,000
469,900
07/17/19
07/18/19
Line 1300 pipeline remediation Blue Water to Valve City Lincoln Station DOT/ESD Test Belen 2 Repair Caprock 2 Repair
158,700
455,200
07/19/19
07/31/19
Line 1300 pipeline remediation Blue Water to Valve City Belen 2 repair Caprock 2 Repair
AN
Dumas Station DOT/ESD Test postponed
172,900
315,700
PR
Puckett 1 maintenance Gas from ITERRELL, IMLTERPK and IYUCBUTE must be routed to Wink thru Line 2000 instead of Waha and will be limited to a total of 98 MDthd.
130,000
L2000 MLV 3 to MLV 4 Pipeline Expansion Tie In Project postponed **EPNG updates the Base Capacity
288,300
334856
L2000 MLV 3 to MLV 4 Pipeline Expansion Tie In Project Goodnight Receipt (IGDNIGHT) to zero **Base Capacity corrected postponed
111,300
316116
L2000 MLV 3 to MLV 4 Pipeline Expansion Tie In Project Goodnight Buyback (DGDNITBY) to zero postponed
5,125
Line 3162 MLV 2 1/2 to MLV 3 Pipeline Expansion Tie In Project postponed **EPNG updates the Base Capacity
215,400
331543
Line 3162 MLV 2 1/2 to MLV 3 Pipeline Expansion Tie In Project Kermit Winkler (DWTG KWX) to zero postponed
8,380
Keystone 4A inspection
769,100
16,400
752,700
Line 1103 Keystone to MLV 1 Pipeline Expansion Tie In Project Keystone "A" Station Shut down postponed
L1105 stopple installation MLV 0 to MLV 4 Psig restriction required **EPNG revises the Base Capacity Rescheduled
229,900
L1105 stopple installation MLV 0 to MLV 4 Psig restriction required **EPNG revises the Base Capacity
07/20/19
Line 1105 Hydro Test Crane to Keystone **EPNG revises the Base Capacity and Start date
314874
Line 1105 Hydro Test Crane to Keystone - ETC - SOUTH KERMIT Delivery (DKERMFUL) Shut in
500
07/30/19
377034
Eunice 3C maintenance no flow at ITEXNEUN during this maintenance only postponed . Alternate scheduling location IWAREUNI
270,120
(Enterprise) WAHA Station maintenance receipts into the EPNG pipeline will be dependent on the individual interconnects pressures. Deliveries from EPNG will be limited by line pressure Canceled
266,900
GE repair (Refer to latest Force Majeure Notice 602549) Deliveries and Receipts at WAHA will be dependent upon pipeline pressures Force Majeure Reduction- 317,625
600,000
317,625
282,375
GE repair (Refer to latest Force Majeure Notice 602549) Deliveries and Receipts at WAHA will be dependent upon pipeline pressures Force Majeure Reduction - 197,625
842,000
197,625
644,375
SM
Pecos 1A inspection
1,162,100
31,300
1,130,800
Corndas 2A repair
1,161,500
36,400
1,125,100
07/26/19
Lordsburg 1A repair
713,700
44,500
669,200
MOJ
Mojave Unit(s) maintenance ( Refer to Update Mojave Prelim July maintenance notice)
463,000
117,000
346,000
400,000
54,000
Mojave Unit(s) maintenance rescheduled ( Refer to Update Mojave Prelim July maintenance notice)
Mojave unit 3 inspection ( Refer to Mojave Prelim July maintenance notice)