STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: December 5, 2018
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following locations.
DSRP PHX (301043)
OPERATING CONDITION SUMMARY: The continued drafting of the system by the location listed below undermines our ability to meet scheduled deliveries and increase linepack in anticipation of the weekend Permian Basin weather (Critical Notice no. 603959).
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to insure that system pressure remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is maximum operational withdrawal.
- Underperformance caps have been placed and will continue to be placed on underperforming supplies.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729 or Dan English at (719) 520-4722.
For media inquiries, please call Lexey Long, (713) 420-4644