Start Date
End Date
Region
Scheduling Location
Maintenance List
Base Capacity Dthd
Reduction Dthd
Net Dthd
Update
3/1/2018
3/16/2018
NM
HACKBRY
Hackberry 1A repair
2,048,800
83,800
1,965,000
3/20/2018
Hackberry 1A shutdown checks
3/21/2018
Hackberry 2A shutdown checks
3/22/2018
Hackberry Station DOT/ESD Test
263,300
1,785,500
3/5/2018
NORTH ML
Navajo 2C repair Window Rock 6B Repair
2,234,800
135,000
2,099,800
3/6/2018
3/8/2018
Navajo Station DOT/ESD Test Leupp 1B inspection Navajo 2C repair Window Rock 6B Repair
285,800
1,949,000
3/9/2018
3/11/2018
3/12/2018
Window Rock 4B maintenance Navajo 2C repair Window Rock 6B Repair
179,700
2,055,100
3/17/2018
3/26/2018
3/27/2018
3/29/2018
Leupp 5B inspection Navajo 2C repair Window Rock 6B Repair
158,100
2,076,700
3/30/2018
3/31/2018
HX
DUTCH F
Line 1104 pipeline remediation Dutch Flats to Alamo Lake
640,300
39,700
600,600
Line 1104 pipeline remediation Dutch Flats to Alamo Lake Alamo Lake 1A inspection
80,100
560,200
3/7/2018
204,600
435,700
SJ
RIO VISTA
Rio Vista Station DOT/ESD Test
151,600
0
3/28/2018
Rio Vista 2A maintenance Rio Vista 1A maintenance
44,900
106,700
Rio Vista 1A maintenance
21,200
130,400
SJ TRI
L1202 pipeline remediation VLV 2 to to White Rock
2,885,800
458,200
2,427,600
3/19/2018
XO
LINCOLN
L1300 pipeline remediation Blue Water to Laguna
628,300
6,100
622,200
1,400
626,900
AN
AMAR N
Dimmitt 1 inspection
314,700
8,400
306,300
AMAR S
311,600
24,500
287,100
PR
KEYST ST
Keystone 12A repair
784,100
33,600
750,500
3/13/2018
3/15/2018
Keystone 12A repair Keystone 11A inspection
77,100
707,000
WAHA GE
GE repair (Refer to latest Force Majeure Notice 601296) Deliveries and Receipts at WAHA will be dependent upon pipeline pressures WAHA 4 repair Force Majeure Reduction - 199,625
600,000
249,625
350,375
WA ST2DS
842,000
592,375
EUNICE C
Eunice 3C Inspection no flow at ITEXNEUN during this maintenance only. Alternate scheduling location IWAREUNI
Eunice 2C inspection
402,300
173,300
229,000
Eunice 1C inspection
3/2/2018
PHX
PHOENIX1
L2223 pipeline remediation MLV 1 to MLV 3
134,000
100,000
34,000
SM
PECOS
Line 1110 pipeline remediation Pecos to Guadalupe
1,262,600
108,800
1,153,800
109,500
1,153,100
GUADLUP
Line 1100 maintenance pig Guadalupe to Cornudas
1,196,800
70,800
1,126,000
CORN LPW
Florida 1A inspection
1,217,500
28,900
1,188,600
Line 1103 hydro test El Paso to Afton
255,200
962,300
CORNL2K
L2000 pipeline remediation El Paso to Afton
621,600
84,256
537,344
CORN HPW
Cornudas B Station DOT/ESD Test
632,000
90,600
541,400
El Paso C Station DOT/ESD Test
46,300
585,700
LORDSBRG
Lordsburg 2A repair
781,600
26,000
755,600
Lordsburg 2A repair Lordsburg 1A shut down checks
93,600
688,000
Lordsburg A Station DOT/ESD Test
LORDS B
Line 1600 smart pig Lordsburg to Bowie
626,300
261,700
364,600
LORDS C
Lordsburg C Station DOT/ESD Test
614,500
87,700
526,800
3/14/2018
CIMARRON
Cimarron Station DOT/ESD Test
612,100
82,600
529,500
WILCLAT
Willcox Station DOT/ESD Test
320,048
210,348
109,700
Willcox 1A shut down checks
131,948
188,100
Willcox 2A shut down checks
129,848
190,200
YUMA
Castle Dome Station DOT/ESD Test
51,390
19,290
32,100
MOJ
MOJTHRU
Mojave Unit(s) maintenance (Refer to Mojave Prelim March maintenance notice )
463,000
83,000
380,000